1. Acceptance of the terms of delivery

All offers not expressly designated as binding are subject to change. All agreements – including those for future deliveries and services – are based exclusively on the following terms; deviating terms of the customer apply only insofar as the supplier has expressly agreed to them in writing.

2. Placing of orders

2.1 Hot-dip galvanizing is governed by DIN EN ISO 1461 in the version valid at the time the contract is concluded, without requirements for post-treatment (DIN abbreviation: tZn o), together with the commentary on this standard. If other technical regulations are to be included in the contract, this requires an express agreement. In deviation from DIN EN ISO 1461, workpieces must be delivered free of oil, grease and paint. Insofar as repairs to the galvanized goods are necessary and possible under DIN EN ISO 1461, they are carried out with zinc dust paint, unless otherwise agreed with the supplier. Work going beyond DIN EN ISO 1461 must be agreed separately. Powder coating is governed by DIN 55633, DIN EN 13438 and the GSB guideline (insofar as the plants are certified accordingly), and wet coating by DIN EN ISO 12944 parts 1 to 8; otherwise the generally recognised rules of technology apply.

2.2 All agreements become binding only upon written confirmation by the supplier. The same applies to additions, amendments and collateral agreements.

2.3 The customer is liable for the correctness and completeness of the documents to be supplied and the information provided by it, in particular for compliance with the safety-relevant information on design suitable for hot-dip galvanizing. Reference is made to the supplier’s current information brochure “Technical notes on hot-dip galvanizing” or “Technical notes on coating”.

2.4 The information and descriptions of services contained in the documents belonging to the supplier’s offer are approximate values customary in the industry, unless they are expressly designated as binding in the order confirmation. The supplier checks whether workpieces provided by the customer conform to contractual specifications (including quantities) or to drawings and samples handed over only on the basis of an express agreement.

3. Delivery

3.1 Delivery times are approximate only, unless a specific delivery date has been confirmed in writing. Delivery periods begin on the day of delivery of the goods, but not before all details of execution have been clarified and all other conditions to be created by the customer for the proper performance of the contract have been fulfilled. They are deemed to have been met if the goods have left the plant at the agreed time or the customer has been notified that they are ready for dispatch. They are also deemed to have been met if delivery is delayed for reasons for which the customer is responsible.

3.2 In the event of subsequent changes to the order by the customer that affect the delivery period, the delivery period is extended to a reasonable extent.

3.3 The delivery period is extended appropriately in the event of unforeseeable extraordinary events which the supplier could not avert despite exercising the care reasonable in the circumstances of the individual case – even if they occur at a sub-supplier – insofar as they have a considerable influence on the completion or delivery of the item to be delivered. These include, in particular, official intervention, operational disruptions, industrial action and delays in the delivery of raw materials and supplies. If the delivery or service becomes impossible as a result of the aforementioned events, the supplier is released from the obligation to deliver without the customer being able to claim damages. If the delay in delivery lasts longer than 2 weeks, the customer is entitled to withdraw from the contract. If the aforementioned impediments occur at the customer, the above legal consequences apply accordingly to its obligation to accept. The contracting parties are obliged to notify the other party without delay of the beginning and end of impediments of the aforementioned kind.

3.4 In the event of a delay in delivery not based on reasons in accordance with 3.2 or 3.3, the customer must grant the supplier a reasonable grace period of at least five working days.

3.5 If the supplier is culpably in default, the customer may, provided that it credibly demonstrates that it has suffered damage as a result, claim compensation of 0.5 % for each completed week of delay, but in total no more than 5 % of the price for the part of the deliveries or services with which the supplier is in default.

3.6 Claims for damages by the customer due to delay in delivery or performance as well as claims for damages in lieu of performance that exceed the limits stated in clause 3.5 are excluded in all cases of delayed delivery or performance, even after expiry of any deadline set for the supplier for delivery or performance. This does not apply insofar as liability is mandatory in cases of intent, gross negligence or injury to life, body or health. With the exception of the provision in clause 3.3, the customer may withdraw from the contract within the scope of the statutory provisions only insofar as the supplier is responsible for the delay in delivery or performance. The above provisions do not entail a change in the burden of proof to the detriment of the customer. At the supplier’s request, the customer is obliged to declare within a reasonable period whether it withdraws from the contract due to the delay in delivery or performance or insists on delivery or performance.

3.7 Partial deliveries of the total order quantity are permissible insofar as they are reasonable for the customer.

3.8 If the items delivered are collected by the customer, securing the load is not one of the supplier’s tasks.

4. Prices

4.1 Unless expressly agreed otherwise, prices for hot-dip galvanizing are quoted in euro/kg; the basis for calculating the price is the weight determined by the supplier. Prices for hot-dip galvanizing are made up of the basic price, the variable metal surcharge (MZ) and any further surcharges. Ancillary work such as removing old paint and old zinc coatings, subsequently making openings in hollow bodies, double dipping of workpieces, fettling and straightening work and fine fettling for coatings are invoiced separately by special agreement, insofar as they exceed the requirements of DIN EN ISO 1461. Prices do not include packaging, freight and insurance. They are subject to the value added tax applicable at the time. If material qualities are delivered that influence the galvanizing process in such a way that the zinc coating applied exceeds the minimum coating thickness according to DIN EN ISO 1461 by more than 50 %, the supplier is entitled to an appropriate additional charge
or to withdraw from the contract.

4.2 Unless expressly agreed otherwise, prices for coating are quoted in euro/m2 of the surface of the workpiece. The basis for calculating the price is the area determined by the supplier. Prices are ex works, excluding packaging, freight, insurance and other ancillary services and costs, plus the value added tax applicable at the time.

4.3 If, in the case of delivery times of more than four months, there is a significant change in certain cost factors, in particular wages, material, energy or freight, the agreed price may be adjusted to a reasonable extent in line with the influence of the relevant cost factors.

5. Terms of payment

5.1 Unless other terms of payment are agreed, all invoices are payable without deduction within 14 days of the invoice date.

5.2 If the agreed payment deadlines are not met, the supplier is entitled to charge interest on the amount due at 5 % above the respective Euribor (1 week), provided that the customer is a merchant within the meaning of § 353 of the German Commercial Code (HGB). The claim to default interest under § 288 II of the German Civil Code (BGB) remains unaffected.

5.3 Bills of exchange and cheques are accepted only by agreement and on condition that they can be discounted and that protest is waived (i.e. with the addition “without protest”). Discount charges are calculated from the due date of the invoice amount.

5.4 If, after conclusion of the contract, the supplier becomes aware of facts indicating a significant deterioration in the customer’s financial circumstances which, in the exercise of due commercial discretion, are likely to jeopardise its claim to consideration, it may, until the time of its performance, demand the provision of appropriate security within a reasonable period, payment in advance or cash payment on collection. If the customer does not comply, or does not comply in time, with the supplier’s justified demand, the supplier may withdraw from the contract and/or claim damages in lieu of performance. If the customer is in arrears with a partial payment, the supplier may declare the entire remaining claim due immediately and, in the event of default in payment caused by a significant deterioration in the customer’s financial situation, withdraw from the contract without a grace period and/or claim damages in lieu of performance. In the case of default in payment not caused by the customer’s financial situation, the supplier may withdraw from the contract after a reasonable period has expired without result.

5.5 The customer may only set off counterclaims that have been acknowledged by the supplier or established by a final court decision.

6. Securing of claims arising from the processing contract

6.1 The customer grants the supplier a lien on the items handed over to the supplier for processing. The lien may also be asserted for claims arising from work and other services carried out earlier, insofar as they are connected with the workpiece. For other claims arising from the business relationship, the lien applies only insofar as these are undisputed or have been established by a final court decision.

6.2 If the processed parts are delivered to the customer before full payment, it is hereby agreed with the customer that it transfers ownership of these parts to the supplier as security for its claims and keeps the parts in safe custody for the supplier free of charge.

6.3 Clause 6.2 applies accordingly to the customer’s expectant right of ownership in the items handed over to the supplier which have been delivered to the customer subject to retention of title. The supplier is entitled to acquire ownership by making the payment that removes the retention. If the items have been transferred to a third party by way of security, the customer assigns to the supplier its claim to retransfer. The same applies to any claims of the customer for over-collateralisation against owners holding title under retention or by way of security.

6.4 The customer hereby assigns to the supplier, by way of security, all claims to which it is entitled against its buyer from a resale of the secured items with or without further processing. The customer remains authorised to collect the claims assigned to the supplier until the supplier revokes this authorisation or the customer no longer properly meets its payment obligations. At the supplier’s request, the customer must disclose the assigned claims and their debtors and hand over all associated documents.

6.5 If the secured items are combined with other goods not belonging to the supplier, the supplier is entitled to the resulting share of co-ownership in the new item in the ratio of the value of the secured items to the other processed goods at the time of combination.

6.6 The customer is not entitled to make other dispositions of the secured items or of the claims assigned to the supplier, in particular by agreements with its buyer. It must notify the supplier without delay of any impairment of the supplier’s rights.

6.7 At the customer’s request, the supplier undertakes to release the securities to which it is entitled under the above provisions insofar as the value of the secured items exceeds the claims to be secured by more than 20 %.

6.8 If the customer is in default with payment of the invoice and has not paid the invoice despite a reminder from the supplier within a grace period of four weeks after the occurrence of default, the supplier is entitled, at the request of the customer’s client, to release the items handed over to the supplier for galvanizing and/or coating to that client against payment. In accordance with the above provision, the supplier is likewise entitled to release them to the customer’s client if items have not been collected by the customer within a period of two weeks despite a request to collect them. Upon full payment
of the invoice by the client, the supplier’s payment claims against the customer are deemed to have been fulfilled.

7. Dispatch and transfer of risk

7.1 Dispatch – insofar as it is organised by the supplier at the request and expense of the customer – is effected ex works, unless a specific agreement has been made, without obligation to use the cheapest mode of dispatch.

7.2 The transport risk passes to the customer – even in the case of carriage-paid delivery – when the goods have been handed over to the carrier or loaded onto a vehicle of the supplier. If the goods are ready for dispatch and dispatch or acceptance is delayed for reasons for which the supplier is not responsible, the risk passes to the customer upon receipt of the notification of readiness for dispatch. If the customer is responsible for the delay in dispatch, the supplier is entitled to store the goods at the customer’s expense and risk. The
supplier is entitled, but not obliged, to insure deliveries in the name and for the account of the customer. Even where a collection date has been agreed, the supplier is not liable for waiting times incurred by the customer or its agents.

8. Inspection, acceptance

If the customer wishes the supplier to carry out inspections of the zinc coating other than those provided for in DIN EN ISO 1461, the type and scope of such inspections must be agreed separately. The same applies to additional coatings. In the absence of a deviating agreement, all inspections take place at the supplier’s plant. Acceptance takes place either expressly upon handover or tacitly upon unreserved receipt at the supplier’s premises. The persons entrusted with receiving the parts are authorised to accept them. An inspection in the presence of the customer or its agent must be agreed separately and takes place on the acceptance date at the supplier’s plant.

9. Liability for defects, notice of defects

9.1 The supplier is liable for defects as follows: recognisable defects must be notified in writing without delay – at the latest within eight days of receipt – but in any case before further processing. If a defect becomes apparent later, it must be notified without delay after it becomes recognisable. Defects whose cause already existed at the time of the transfer of risk are remedied by the supplier free of charge, at its option, by rectification or replacement delivery. If subsequent performance fails, the customer may demand rescission of the contract or
a reduction of the remuneration.

9.2 In the case of hot-dip galvanizing, there is no liability for defects caused by workpieces not manufactured in a manner suitable for hot-dip galvanizing and/or not visible to the naked eye, or if the “Technical notes on hot-dip galvanizing” have not been fully observed. Furthermore, the supplier is not liable for defects arising after the transfer of risk as a result of unsuitable or improper storage or use, faulty or negligent handling or extraordinary external influences. In particular, the supplier is not liable for defects arising from the use of the galvanized and/or coated material in offshore installations. Offshore installations are risks located in the sea/off the coast (e.g. oil platforms, drilling rigs, pipelines, wind turbines). The offshore area begins at the shoreline at mean high water.

9.3 There is no liability for defects in the coating in the case of recoating or overcoating of material that has already been coated, stripped or anodised, or if the defects are due to the material delivered by the customer, or if the “Technical notes on coating” have not been fully observed. Liability is also excluded for defects that are unavoidable according to the respective state of the art or are based on missing or inaccurate information from the customer.

9.4 Furthermore, there are no claims for defects in the case of an insignificant deviation from the agreed quality or an insignificant impairment of usability. If the customer or third parties carry out improper modifications or repair work, there are likewise no claims for defects in respect of these and the resulting consequences.

9.5 After consultation with the supplier, the customer must allow the supplier the necessary time and opportunity to carry out all rectifications that the supplier considers necessary at its reasonable discretion; otherwise the supplier is released from liability for defects.

9.6 Claims by the customer for the expenses required for the purpose of subsequent performance, in particular transport, travel, labour and material costs, are excluded insofar as the expenses increase because the item delivered has subsequently been taken to a place other than the customer’s place of business, unless this corresponds to its intended use. The customer bears any corresponding additional costs of the supplier.

9.7 Claims for defects become time-barred 12 months after acceptance in accordance with clause 8 or after notification to the customer that the goods are ready for dispatch. This does not apply insofar as the law prescribes longer periods in accordance with § 634a (1) no. 2 BGB, or in cases of injury to life, body or health, intentional or grossly negligent breach of duty by the supplier and fraudulent concealment of the defect. The statutory provisions on suspension of expiry, suspension and recommencement of periods remain unaffected.

9.8 Within the statutory limitation period, the supplier is also liable for defective rectification work or defective replacement deliveries in accordance with the provisions of this clause 9.

9.9 In the event of notices of defects, payments by the customer may be withheld to an extent that is in reasonable proportion to the defects that have occurred. The customer may withhold payments only if a notice of defect is asserted whose justification is beyond doubt. If the notice of defect was unjustified, the supplier is entitled to demand reimbursement of the expenses incurred by it from the customer.

9.10 Claims for damages by the customer on account of a defect are excluded. This does not apply in the event of fraudulent concealment of the defect, non-compliance with a quality guarantee, injury to life, body or health or an intentional or grossly negligent breach of duty by the supplier. The above provisions do not entail a change in the burden of proof to the detriment of the customer. Further or other claims of the customer on account of a defect than those regulated in this clause 9 are excluded.

10. Impossibility, adjustment of the contract

10.1 Insofar as delivery or performance is impossible, the customer is entitled to claim damages, unless the supplier is not responsible for the impossibility. However, the customer’s claim for damages is limited to 10 % of the value of the service whose performance has become impossible. This limitation does not apply insofar as liability is mandatory in cases of intent, gross negligence or injury to life, body or health; this does not entail a change in the burden of proof to the detriment of the customer. The customer’s right to withdraw from the contract remains unaffected.

10.2 If unforeseeable events within the meaning of clause 3.3 significantly change the economic significance or the content of the delivery or service or have a significant effect on the supplier’s business, the contract is adjusted appropriately in good faith. Insofar as this is not economically justifiable, the supplier has the right to withdraw from the contract. If it wishes to exercise this right of withdrawal, it must notify the customer without delay after becoming aware of the significance of the event, even if an extension of the delivery time was initially agreed with the customer.

11. Other claims for damages

11.1 Unless otherwise regulated in these General Terms and Conditions, claims for damages by the customer, irrespective of the legal grounds, in particular for breach of obligations arising from the contractual relationship and in tort, are excluded.

11.2 This does not apply insofar as liability exists as follows:

  • a)under the German Product Liability Act
  • b)in the case of intent
  • c)in the case of gross negligence on the part of owners, legal representatives or executive employees
  • d)in the case of fraudulent intent
  • e)in the case of non-compliance with a guarantee given
  • f)for culpable injury to life, body or health, or
  • g)for culpable breach of material contractual obligations.

However, the claim for damages for breach of material contractual obligations is limited to the foreseeable damage typical for the contract, unless another of the aforementioned cases applies.

11.3 The above provisions do not entail a change in the burden of proof to the detriment of the customer.

12. Place of performance and jurisdiction

12.1 The place of performance for all obligations arising from the contractual relationship is the supplier’s registered office. For all legal disputes, including proceedings relating to bills of exchange or cheques, the court at the supplier’s registered office has jurisdiction if the customer is a registered merchant, a legal entity under public law or a special fund under public law.

12.2 The contractual relationship is governed by German law.

13. Binding nature of the contract

The contract remains binding in its remaining parts even if individual provisions are legally invalid. This does not apply if adherence to the contract would constitute an unreasonable hardship for one party.

Lattice mast construction
General Terms of Delivery of WIEGEL Parey GmbH & Co KG (lattice mast construction)

Version: February 2020

1. Scope of these General Terms of Delivery

These General Terms of Delivery apply exclusively to the legal relationship between WIEGEL Parey GmbH & Co KG (hereinafter: WIEGEL Parey) and the customer not acting as a consumer of deliveries and/or services of WIEGEL Parey (hereinafter: deliveries), unless the contract is a construction contract. General terms and conditions of the customer apply only insofar as WIEGEL Parey has expressly agreed to them in writing. § 305b BGB remains unaffected.

2. Conclusion of the contract

2.1 The offers of WIEGEL Parey are subject to change and non-binding. This also applies if catalogues, technical documentation, drawings, plans, calculations, cost estimates, references to DIN standards or other product descriptions or documents – including in electronic form – are made available to the customer.

2.2 The customer’s order for the deliveries is deemed a binding contractual offer. Unless the order expressly states otherwise, WIEGEL Parey may accept this contractual offer within three weeks of receipt.

3. Creditworthiness, right of revocation/withdrawal

WIEGEL Parey reserves the right to secure the deliveries through a trade credit insurance of its choice. If the trade credit insurer chosen by WIEGEL Parey issues a negative decision due to the customer’s insufficient creditworthiness, the customer is obliged, at the request of WIEGEL Parey, within two weeks and at its own choice, to pay the agreed prices in advance or to provide a suitable guarantor for its payment obligations. If this period expires without result, WIEGEL Parey is entitled, without any obligation to pay compensation to the customer, to revoke offers and other declarations of intent aimed at concluding the contract or to withdraw from a contract already concluded. Withdrawal must be declared no later than one month after conclusion of the contract.

4. Prices, terms of payment, set-off and rights of retention

4.1 Prices are ex works plus the statutory value added tax applicable at the time. Invoicing is based on the theoretical weight of the circumscribing rectangle plus a 4 % surcharge for galvanizing (3 %) and rolling tolerances (1 %).

4.2 If WIEGEL Parey has undertaken assembly or service work and nothing else has been agreed, the customer reimburses, in addition to the agreed remuneration, the necessary incidental costs such as travel and transport costs as well as allowances upon proof.

4.3 All invoices are to be paid without deduction within 14 days of receipt of the invoice and delivery or acceptance.

4.4 If a cash discount is agreed for payment within a certain discount period, this period is only observed if the justified invoice amount has been received in full by WIEGEL Parey within the agreed discount period. The discount period begins with the payment period in accordance with 4.3.

4.5 The customer is entitled to rights of set-off or retention only if its counterclaims have been established by a final court decision or are undisputed, or if its counterclaims are based on the same contractual relationship. WIEGEL Parey is entitled to avert the exercise of a right of retention by providing security – including by way of a guarantee.

5. Retention of title and other security rights

5.1 The items delivered (hereinafter: reserved goods) remain the property of WIEGEL Parey until all payment claims to which WIEGEL Parey is entitled against the customer under the contract and an ongoing business relationship have been fulfilled.

5.2 As long as the retention of title exists, the customer is prohibited from pledging the reserved goods or transferring them by way of security.

5.3 Subject to revocation, the customer is authorised in accordance with the following conditions to resell and/or process the reserved goods in the ordinary course of business:

  • a)The retention of title extends to the products resulting from the processing, mixing or combining of the reserved goods at their full value, with WIEGEL Parey being deemed the manufacturer. Processing is carried out for WIEGEL Parey. The customer keeps the resulting new item for WIEGEL Parey with the care of a prudent merchant and stores it separately and marked as the property of WIEGEL Parey. The new item is deemed reserved goods. If, in the case of mixing or combining with goods of third parties, their right of ownership remains, WIEGEL Parey acquires co-ownership in the ratio of the invoice values of the mixed or combined goods. Otherwise, the same applies to the resulting product as to the reserved goods.
  • b)The customer hereby assigns to WIEGEL Parey by way of security the claims against third parties arising from the resale of the reserved goods or the product, in full or in the amount of any co-ownership share of WIEGEL Parey in accordance with the preceding letter. WIEGEL Parey accepts the assignment.
  • c)The customer remains authorised to collect the claims from the resale alongside WIEGEL Parey. However, WIEGEL Parey may only collect the claims if there is good cause and after asserting the rights under clause 5.5. Good cause exists in particular if the customer is in default of payment to WIEGEL Parey or lacks the ability to perform within the meaning of § 321 BGB. As soon as WIEGEL Parey is entitled to collect the claims, the customer must inform WIEGEL Parey of the assigned claims and their debtors, provide all information required for collection, hand over the associated documents and notify the debtors (third parties) of the assignment. In this case, WIEGEL Parey is also entitled to revoke the customer’s authorisation to resell and process the reserved goods.

5.4 In the event of attachments, seizures or other dispositions or interventions by third parties, the customer must notify WIEGEL Parey in writing without delay. If a legitimate interest is credibly demonstrated, the customer must provide WIEGEL Parey without delay with the information required to assert its rights against the customer’s client and hand over the necessary documents.

5.5 In the event of breaches of duty by the customer, in particular default in payment, WIEGEL Parey is entitled, after a reasonable period set for the customer to perform has expired without result, unless such a period is dispensable under statutory or contractual provisions, to withdraw from the contract in accordance with the statutory provisions and/or to demand return of the reserved goods on the basis of the retention of title. Unless declared otherwise, the demand for return does not constitute a withdrawal from the contract.

5.6 Insofar as the value of all security rights to which WIEGEL Parey is entitled exceeds the amount of all secured claims by more than 10 %, WIEGEL Parey will release the excess part of the security rights at the customer’s request.

6. Delivery periods and default

6.1 Compliance with agreed delivery periods requires the timely receipt of all documents, necessary permits and approvals to be supplied by the customer, in particular of plans, as well as the timely performance of other acts of cooperation by the customer. If these conditions are not met in time, the periods are extended by the duration of the delay plus a reasonable additional period for resuming performance; this does not apply insofar as WIEGEL Parey is responsible for the delay.

6.2 If non-compliance with the periods is due to circumstances for which WIEGEL Parey is not responsible, in particular

  • a)force majeure or other circumstances that WIEGEL Parey cannot avert, e.g. mobilisation, war, acts of terrorism, riot,
  • b)strike or a lockout ordered by the employers’ professional association in the business of WIEGEL Parey or in a business working directly for it,
  • c)virus and other attacks by third parties on the IT system of WIEGEL Parey, insofar as these occurred despite the care customary in protective measures being exercised,
  • d)impediments due to German, US or other applicable national, EU or international regulations of foreign trade law, or
  • e)failure of its suppliers to supply WIEGEL Parey on time, if WIEGEL Parey has concluded a congruent covering transaction and neither WIEGEL Parey nor the supplier is at fault, or WIEGEL Parey is not obliged to procure in the individual case,

the periods are extended by the duration of the disruption plus a reasonable additional period for resuming performance. WIEGEL Parey will inform the customer of this without delay and at the same time notify it of the expected new delivery period. If delivery is not possible even within the new delivery period for the reasons stated in sentence 1, WIEGEL Parey may withdraw from the contract in whole or in part; WIEGEL Parey will refund without delay any consideration already provided by the customer. The statutory rights, in particular in the event of an exclusion of the obligation to perform (e.g. due to impossibility or unreasonableness of performance and/or subsequent performance), remain unaffected. However, the customer is not entitled to withdraw from the contract for non-compliance with the performance periods if WIEGEL Parey is not responsible for exceeding them.

6.3 At the request of WIEGEL Parey, the customer is obliged to declare within a reasonable period whether it withdraws from the contract due to the delay in delivery or insists on delivery.

6.4 If dispatch or delivery is delayed by more than one month at the customer’s request, if the customer is in default of acceptance or if delivery is delayed for other reasons for which the customer is responsible, the customer must pay lump-sum compensation for the resulting damage and expenses (including additional expenses such as storage costs) of 0.5 % of the price agreed for the deliveries to be dispatched or delivered late for each month of delay or part thereof, beginning with the delivery period or – in the absence of a delivery period – with the notification of readiness for dispatch or collection. The contracting parties remain free to prove higher or lower damage.

7. Terms of delivery, packaging and dispatch

7.1 Unless expressly agreed otherwise or unless the assembly of the items to be delivered by WIEGEL Parey has been agreed, the item to be delivered is made available “ex works” (EXW, Incoterms 2010), but without transport packaging.

7.2 If a place of delivery other than EXW has been agreed, the customer must notify WIEGEL Parey in good time of a shipping address to be determined by it as agreed. Unless otherwise agreed, WIEGEL Parey is entitled to determine the type of dispatch (in particular transport company, shipping route, packaging) at its reasonable discretion.

7.3 The customer may not refuse to accept deliveries because of insignificant defects.

7.4 Partial deliveries not agreed upon are permissible insofar as the partial delivery can be used by the customer within the scope of the contractual purpose, delivery of the remaining goods ordered is ensured and the partial delivery does not cause the customer any significant additional effort or additional costs which WIEGEL Parey has not agreed to bear.

8. Transfer of risk

8.1 The risk of accidental loss and accidental deterioration passes to the customer at the latest upon handover. If delivery is made to a place other than ex works, however, the risk of accidental loss and accidental deterioration as well as the risk of delay pass as soon as the goods are handed over to the forwarder, the carrier or the other person or institution designated to carry out the shipment. Insofar as acceptance has been agreed or is provided for by law, this is decisive for the transfer of risk. It is equivalent to handover or acceptance if the customer is in default of acceptance or if WIEGEL Parey stores the items to be delivered after completion as agreed or at the customer’s request; in the case of storage, the time at which the notice of completion is sent to the customer is decisive.

8.2 At the request and expense of the customer, deliveries are insured by WIEGEL Parey against the usual transport risks.

9. Assembly and other services at the customer’s premises

9.1 WIEGEL Parey owes assembly services, erection and other services such as maintenance, repair or servicing (hereinafter: assembly services) or planning services only if this has been expressly agreed. Unless otherwise agreed, the following provisions apply to these services:

9.2 Before the start of the assembly services, the customer must provide, without being asked, the necessary information on the location of exposed and concealed utility lines (e.g. electricity, gas, water and tele­communication lines) as well as the necessary structural data.

9.3 Before the start of the assembly services, the materials and items to be provided by the customer that are required to begin the work must be at the assembly site, and all preparatory work to be performed by the customer must have progressed to such an extent that assembly can begin as agreed and be carried out without interruption. Access routes and the assembly site must be levelled and cleared.

9.4 If the assembly services are delayed by circumstances for which WIEGEL Parey is not responsible, the customer must bear the costs incurred for waiting time and additional journeys of the assembly personnel, insofar as these could not be avoided. Further claims of WIEGEL Parey in the event of default of acceptance or due to delays for which the customer is responsible remain unaffected.

9.5 The customer must certify to WIEGEL Parey weekly the working hours of the assembly personnel and, without delay, the completion of the assembly services.

9.6 WIEGEL Parey is entitled to have assembly services or planning services performed by subcontractors. The customer may object to the use of a subcontractor if the use of this subcontractor is unreasonable for it and the subcontractor is not an affiliated company of WIEGEL Parey within the meaning of § 15 of the German Stock Corporation Act (AktG).

10. Rights in the event of defects

10.1 If the customer can demand subsequent performance due to a defect, WIEGEL Parey has the right to choose whether to remedy the defect by rectification or by new delivery/new production. The right to refuse subsequent performance under the statutory conditions remains unaffected.

10.2 Claims for defects become time-barred 12 months from the statutory commencement of the limitation period. This period does not apply to claims for defects in accordance with §§ 438 (1) no. 2 or 634a (1) no. 2 BGB (for building materials or construction, construction planning or construction supervision services), in the case of recourse in the supply chain of a sale of consumer goods (§ 478 BGB), in the case of intent, fraudulent concealment of the defect or non-compliance with a quality guarantee. The statutory provisions on suspension of expiry (in particular under § 445b (2) BGB), suspension and recommencement of periods remain unaffected.

10.3 Notices of defects by the customer must be made in writing without delay. If the contract is a commercial transaction, § 377 HGB (obligation to inspect and give notice of defects) also applies to contracts other than contracts of sale and contracts for work and materials. The customer must inspect goods intended for installation or other further processing at the latest immediately before processing, unless WIEGEL Parey owes the installation or further processing.

10.4 There is no material defect if there is only an insignificant impairment of suitability for the use presupposed under the contract or for customary use.

10.5 Recourse claims of the customer against WIEGEL Parey in accordance with § 445a BGB (entrepreneur’s recourse) exist only insofar as the customer has not made any agreements with its buyer going beyond the statutory claims for defects.

10.6 Claims for damages by the customer on account of a defect exist only in the cases regulated in clause 13.2. This provision does not entail a change in the burden of proof to the detriment of the customer.

10.7 The provisions of clauses 10.1 to 10.5 do not apply to claims of the customer against WIEGEL Parey under § 445a BGB (seller’s recourse) if the last contract in the supply chain is a sale of consumer goods.

10.8 WIEGEL Parey provides advice to the best of its knowledge on the basis of its own experience, but to the exclusion of any liability. Information and statements on the suitability and application or use of the subject matter of the contract are non-binding unless they are expressly an agreed quality. They do not release the customer from carrying out its own checks.

11. Industrial property rights and copyrights

11.1 Unless otherwise agreed, WIEGEL Parey is obliged to provide the delivery free of industrial property rights and copyrights of third parties (hereinafter: property rights) only in the country of the place of delivery. If a third party asserts justified claims against the customer for infringement of property rights by deliveries made by WIEGEL Parey and used in accordance with the contract, WIEGEL Parey is liable to the customer as follows:

  • a)WIEGEL Parey will, at its option and at its expense, either obtain a right of use for the deliveries concerned, modify them so that the property right is not infringed, or replace them.
  • b)The obligation of WIEGEL Parey to pay damages is governed by clause 13.

11.2 The customer is obliged to notify WIEGEL Parey in writing without delay of the claims asserted by the third party, not to acknowledge an infringement or the existence of claims, and to defend against these claims only in agreement with WIEGEL Parey. If the customer stops using the delivery to mitigate damage or for other important reasons, it is obliged to point out to the third party that the cessation of use does not constitute an acknowledgement of an infringement of property rights.

11.3 Claims of the customer are excluded insofar as it is responsible for the infringement of property rights.

11.4 Claims of the customer are further excluded insofar as the infringement of property rights is caused by special specifications of the customer, by an application not foreseeable by WIEGEL Parey or by the delivery being modified by the customer or used together with products not supplied by WIEGEL Parey.

11.5 Insofar as an existing infringement of property rights also constitutes a material defect or defect of title, the provisions of clauses 10.1 to 10.8 apply accordingly in addition to the above provisions.

11.6 If WIEGEL Parey has to deliver in accordance with specifications, drawings, models, samples or using parts provided by the customer, the customer is liable for ensuring that third-party property rights are not infringed as a result. WIEGEL Parey will inform the customer of property rights known to WIEGEL Parey. The customer indemnifies WIEGEL Parey against all third-party claims and compensates for the damage incurred. If WIEGEL Parey is prohibited by a third party from manufacturing or delivering on the basis of a property right belonging to that third party, WIEGEL Parey is entitled, without examining the legal situation, to stop the work, unless the alleged property rights obviously do not conflict with the manufacture or delivery.

11.7 The property rights to the models, moulds and devices, designs and drawings created by WIEGEL Parey or by a third party on behalf of WIEGEL Parey belong to WIEGEL Parey, even if the customer has borne the costs for them.

12. Rights to documents

12.1 Ownership rights and copyrights to cost estimates, drawings, calculations and other documents (hereinafter: documents) handed over by WIEGEL Parey to the customer pass to the customer only by express agreement. The documents may be made accessible to third parties only with the prior consent of WIEGEL Parey and must be returned to WIEGEL Parey without delay upon request if a contract with WIEGEL Parey is not concluded or the contract ends through performance or in another way (e.g. termination, withdrawal). Sentences 1 and 2 apply accordingly to documents of the customer; however, these may be made accessible to third parties to whom WIEGEL Parey has permissibly transferred deliveries and, if they were sent before conclusion of the contract and no contract was concluded, may be destroyed three months after submission of the offer unless the customer has previously requested their return.

12.2 Clause 12.1 sentences 1 and 2 apply accordingly to samples, models, moulds, tools and special devices that WIEGEL Parey produces in the course of performing the contract.

13. Other claims for damages

13.1 Unless otherwise regulated in these General Terms of Delivery, claims for damages by the customer, irrespective of the legal grounds, in particular for breach of obligations arising from the contractual relationship and in tort, are excluded.

13.2 This does not apply insofar as liability exists

  • a)under the German Product Liability Act,
  • b)in the case of intent,
  • c)in the case of gross negligence,
  • d)in the case of fraudulent intent,
  • e)in the case of non-compliance with a guarantee given,
  • f)for injury to life, body or health, or
  • g)for breach of obligations whose fulfilment makes the proper performance of the contract possible in the first place and on whose fulfilment the customer may rely according to the purpose and content of the contract (material contractual obligations).

However, the claim for damages for breach of material contractual obligations is limited to the foreseeable damage typical for the contract, unless another of the aforementioned cases applies at the same time. Our liability for slightly negligent breach of material contractual obligations (clause 13.2 para. 2 of the GTC) is limited to the amount of our net remuneration claim agreed for the case of complete performance.

13.3 The above provisions do not entail a change in the burden of proof to the detriment of the customer.

14. Assignment and pledging

The assignment or contractual pledging of claims of the customer against WIEGEL Parey is permissible only with the consent of WIEGEL Parey.

15. Data protection

Information on data protection and on the processing of personal data by WIEGEL Parey is available at the internet address /datenschutz/.

16. Jurisdiction and applicable law

16.1 If the customer is a merchant, a legal entity under public law or a special fund under public law, the sole place of jurisdiction for all disputes arising directly or indirectly from the contractual relationship is the registered office of WIEGEL Parey. However, WIEGEL Parey is also entitled to bring an action at the customer’s registered office. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

16.2 This contract, including its interpretation, is governed by the law of the Federal Republic of Germany, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

17. Severability clause

Should one of the provisions of these terms of delivery or of the other parts of the contract be invalid, or should the contract, including these terms of delivery, contain a gap in its entirety, the validity of the remaining contractual provisions is not affected. Insofar as the invalidity of the contractual provision is not due to statutory provisions serving to protect a contracting party, the invalid provision is replaced by a valid one and a missing one is inserted in such a way that the intention of the contracting parties expressed in the contract and the purpose of the contract are met as far as possible.

Contract terms for construction work

Contract terms for the performance of construction work
of WIEGEL Parey GmbH & Co KG (lattice mast construction)

Version: December 2019

1. Contract terms for the performance of construction work

1.1 For construction contracts between WIEGEL Parey GmbH & Co KG (hereinafter: WIEGEL Parey) as client and the contractor not acting as a consumer, these General Contract Terms for the Performance of Construction Work (hereinafter: AVB-Bau) apply in addition to the other documents agreed as part of the contract, and, subordinate to these AVB-Bau, the German General Contract Terms for the Execution of Construction Work (VOB/B) in the version published at the time the contract is concluded.

1.2 Conflicting or additional terms of the contractor to which WIEGEL Parey has not expressly agreed in writing do not apply. WIEGEL Parey expressly objects to the validity of such terms of the contractor that have not been expressly agreed, also for the future. § 305b BGB remains unaffected.

2. Scope of the contractor’s services

2.1 Insofar as the services to be performed are described functionally, the contractor owes, for the agreed remuneration, all partial services required to achieve the functionally described result.

2.2 Insofar as the services to be performed are described in detail, the contractor owes, for the agreed remuneration, all ancillary services within the meaning of VOB/C. The contractor owes special services within the meaning of VOB/C that are not expressly described, for the agreed remuneration, insofar as they are necessary in order to perform the expressly described services free of defects.

2.3 The contractor is obliged to inform WIEGEL Parey without delay of any errors (including obvious ones), typing and calculation errors it identifies in the documents, drawings and plans submitted by WIEGEL Parey. This also applies to missing documents or drawings.

2.4 If the contractor has not offered any equivalent makes for the makes proposed in the contract documents, the makes proposed in the contract documents are deemed to be owed under the contract. Any addition “or equivalent” listed in the specification of services or other documents is then deemed deleted and does not become part of the contract. If several makes are proposed in the contract documents prepared by WIEGEL Parey, the contractor selects the make to be used at its reasonable discretion. If several makes are proposed in the contract documents prepared by the contractor, WIEGEL Parey selects the make to be used at its reasonable discretion.

If the contractor has offered an alternative make, it must prove equivalence, in particular with regard to performance characteristics, appearance, function, building physics, operating costs, maintenance and the comprehensive suitability of this make for meeting the contractually owed requirements. The contractor must provide the proof of equivalence without being asked, without delay after conclusion of the contract, by submitting meaningful comprehensive documents – at the request of WIEGEL Parey also by submitting samples. If the contractor cannot provide proof of equivalence, paragraph 1 applies.

2.5 Insofar as non-harmonised construction products are to be supplied or processed and nothing to the contrary has been expressly agreed, the construction products supplied or to be processed must meet the requirements of the applicable model administrative regulation on technical building rules (MVV TB) of the DIBt; the manufacturer’s declarations, certificates or test certificates required thereunder must be handed over to WIEGEL Parey at the latest upon delivery or before processing. Insofar as harmonised construction products are to be supplied or processed, the contractor may only use products bearing a CE marking; the contractor must hand over the corresponding declarations of performance for the products to WIEGEL Parey at the latest upon delivery or before processing.

3. Changes to the services

3.1 The ordering of changes to the services (including changes to the agreed result of the work) and their effect on the claim to remuneration are governed by §§ 650b et seq. BGB. § 1 (3) and (4) VOB/B and § 2 (5) and (6) VOB/B do not apply. Insofar as other provisions of VOB/B refer to § 2 (5) or (6) VOB/B, § 650c BGB and the following provisions apply accordingly. The right to order changes also includes the right to order changes to the construction circumstances, the construction time or the execution periods, unless these are unreasonable for the contractor.

3.2 The right to order changes and the contractor’s obligation under § 650b (2) BGB do not require that WIEGEL Parey has previously requested the change or that the contracting parties have previously tried to reach agreement on the change and its effects on the remuneration.

3.3 If the contractor considers the execution of a change to the agreed result of the work to be unreasonable, it will notify WIEGEL Parey of this, stating the reasons, without delay after receipt of the change request or – if there is no prior change request – of the change order.

3.4 If WIEGEL Parey requests a change or if WIEGEL Parey orders a change without a prior change request, the contractor will submit a supplementary offer in accordance with § 650b (1) sentence 2 BGB without delay after receipt of the order or request.

3.5 The reduction or increase in remuneration is to be determined on the basis of the prices agreed in the bill of quantities or a list of unit prices, insofar as the services omitted or added as a result of the change are described in the bill of quantities or the list of unit prices, and otherwise in accordance with § 650c BGB. Discounts granted in the main contract also apply to the remuneration determined in accordance with sentence 1.

3.6 A change to the services owed through plans or other documents handed over by WIEGEL Parey or by third parties commissioned by WIEGEL Parey does not constitute an order. In this case, the contractor is obliged to notify the change in services and the resulting additional costs and any effects on deadlines in text form without delay and to obtain a corresponding order or propose an amendment to the contract. If it fails to do so, its claims are governed by § 2 (8) VOB/B.

4. Execution and execution documents

4.1 Immediately upon receipt, the contractor must check the documents handed over to it completely and in detail and, where possible, take all measurements on site and compare them with the information in the documents. The contractor must notify in text form, before work begins, any discrepancies (such as planning errors, gaps, contradictions, ambiguities, violations of the generally recognised rules of technology, dimensional deviations, etc.) as well as any concerns about the intended method of execution or the prescribed building materials.

4.2 The planning documents prepared by the contractor must be submitted to WIEGEL Parey for review and approval in good time before execution begins. WIEGEL Parey has a reasonable period, but at least 2 weeks, for the review and approval of the execution documents. When sending the planning documents, the contractor must expressly state by when it needs approval of the plans at the latest so that there is no delay in construction.

4.3 Only documents approved for execution by WIEGEL Parey may be used as the basis for execution.

4.4 The approval of planning documents by WIEGEL Parey does not constitute an acknowledgement of the need for a change in services or a contractual change in services. If the contractor identifies changes in services in planning documents to be approved, it must expressly point this out to WIEGEL Parey.

4.5 The contractor must return documents provided to it by WIEGEL Parey once the limitation period for claims for defects in the services concerned by the documents has expired. It may allow third parties to inspect these documents only with the prior consent of WIEGEL Parey.

4.6 The contractor is obliged to continuously clear the construction site of waste, packaging material, rubble and other dirt caused by its services. After completion, it must leave all rooms and areas in broom-clean condition.

4.7 At the request of WIEGEL Parey, the contractor must keep daily construction reports and hand them over to WIEGEL Parey at the end of each week. They must contain all information that may be relevant for the execution and invoicing of the order. Depending on the type of service, this may include in particular: weather (in particular temperatures, precipitation); services performed; number, type and qualification of the workers employed on the construction site; working hours; number and type of large equipment used and its arrival and removal; delivery of main building materials; type, scope and location of the work performed with the essential information on construction progress (start and end of larger-scale services); stoppage of work with reasons; accidents and other important incidents.

5. Evidence for the prevention of undeclared work and compliance with labour and social security law

5.1 The contractor must submit the following documents to WIEGEL Parey without delay after conclusion of the contract at the latest:

  • a)if the contractor is to perform craft services requiring a licence under Annex A to the German Crafts Code (Handwerksordnung): proof of entry in the register of craftsmen or, if the contractor only maintains branches in other EU or EEA states, proof of notification to the competent chamber of crafts,
  • b)an extract from the central trade register or comparable official proof from its home state, in each case not older than 3 months.

5.2 Before workers are deployed on the construction site for the first time, the contractor must submit to WIEGEL Parey:

  • a)proof of prequalification in accordance with § 6b (1) VOB/A, § 28e (3b) SGB IV
    or
    qualified certificates of good standing from the statutory accident insurance institutions responsible for the contractor or the temporary employment agencies it has commissioned (§ 150 (3) SGB VII), certificates of good standing from the collecting agencies responsible for the contractor or the temporary employment agencies it has commissioned for the total social security contributions (§ 28e (3f) SGB IV) and a qualified certificate of good standing from the social funds responsible for the contractor or the temporary employment agencies it has commissioned, stating the gross wage totals,
  • b)the registrations under § 16 MiLoG, § 18 AEntG and § 17b AÜG, insofar as the registration obligations under § 16 MiLoG, § 18 AEntG or § 17b AÜG exist,
  • c)A1 posting certificates for each worker to be deployed, insofar as employees of an employer based abroad are deployed.

If, after handing over these documents, the contractor deploys additional workers who are not covered by the scope of validity of the documents previously handed over, it must submit the documents relating to the additional workers before they are deployed.

5.3 Without delay after the end of each calendar month in which the contractor has deployed workers on the construction site, the contractor must submit to WIEGEL Parey its records of the start, end and duration of the employees’ daily working time in accordance with § 17 (1) MiLoG, § 19 (1) AEntG or the German Minimum Wage Recording Ordinance (MiLoAufzV).

5.4 The evidence referred to in clauses 5.1 and 5.2 must be resubmitted in its current version, without being asked, as soon as and insofar as the period of validity of the documents previously submitted expires.

5.5 WIEGEL Parey is entitled to refuse payments to a reasonable extent if this evidence is not submitted or is submitted incompletely.

5.6 At the request of WIEGEL Parey, the contractor is obliged to authorise it in writing to obtain information on the payment of total social security contributions from the competent collecting agencies for the individual social security institutions or from the individual competent social security institutions, as well as information on the payment of statutory accident insurance contributions from the competent employers’ liability insurance associations.

6. Deployment of employees, liability of the contractor for recourse liability, etc.

6.1 With regard to the workers deployed by the contractor on the construction site, the contractor is obliged towards WIEGEL Parey to comply with the applicable legal provisions on the remuneration of its workers, the granting of working conditions and the fulfilment of obligations under accident insurance and social security law. The contractor indemnifies WIEGEL Parey against all claims that an employee deployed by it or one of its subcontractors, or a social security institution or social fund, justifiably asserts against WIEGEL Parey due to the breach of the obligations stated in sentence 1, e.g. under § 14 AEntG, § 13 MiLoG, § 98a AufenthG, § 28e SGB IV or § 150 (3) SGB VII, and compensates WIEGEL Parey for all damage incurred by WIEGEL Parey as a result of such claims.

6.2 If the contractor or a subcontractor commissioned by it deploys foreign nationals for the performance of the services owed by the contractor whose employment requires a permit under § 4 (3) AufenthG or § 284 (1) SGB III, it must give WIEGEL Parey the names of these employees and submit the required permit before they are deployed.

6.3 If a fine is imposed on WIEGEL Parey or one of its representatives due to the unlawful employment of foreign workers by the contractor or a subcontractor of the contractor, the contractor reimburses the fine to WIEGEL Parey or its representative. Further claims for damages of WIEGEL Parey remain unaffected.

6.4 The contractor must ensure that all persons working on the construction site on its behalf and on behalf of its subcontractors or temporary employment agencies carry identity cards/passports and social security cards with them at all times. WIEGEL Parey is entitled to carry out corresponding checks. WIEGEL Parey may expel persons who do not carry these documents from the construction site with immediate effect.

6.5 The contractor provides WIEGEL Parey weekly with a list of all workers deployed by the contractor or its subcontractors.

6.6 The contractor is responsible for compliance with occupational health and safety. In doing so, it must comply with the provisions of a health and safety plan drawn up for the construction site, follow the instructions of a health and safety coordinator appointed for the construction site, make all necessary arrangements and take all necessary measures, and provide the necessary facilities. It is obliged to organise its operational processes in such a way that no hazards arise.

7. Deployment of subcontractors

7.1 The transfer of the performance obligations assumed by the contractor to subcontractors requires the prior written consent of WIEGEL Parey.

7.2 The contractor must ensure that the subcontractor does not award the services transferred to it to further subcontractors – not even in part – without the prior written consent of WIEGEL Parey.

7.3 The contractor must ensure, by means of corresponding contractual agreements with its subcontractors and temporary employment agencies, that it can fulfil its obligations under clauses 5, 6, 15 and 17 towards WIEGEL Parey. Upon request, the contractor provides WIEGEL Parey with proof that corresponding agreements have been concluded with its subcontractors and temporary employment agencies.

7.4 WIEGEL Parey is entitled to prohibit, with immediate effect, the deployment of workers of a subcontractor or temporary employment agency of the contractor on the construction site that is the subject of the contract if the contractor does not fulfil its obligations towards WIEGEL Parey under clauses 5 and/or 6 with regard to this subcontractor/agency or its workers, or if the contractor does not prove, at the request of WIEGEL Parey, that it has ensured compliance with these obligations by means of agreements with the subcontractor or agency. The prohibition may be revoked with effect for the future if the subcontractor or agency undertakes to comply with these provisions, this is proven to WIEGEL Parey and the subcontractor or agency compensates for breaches of duty committed, e.g. in the event of non-payment of minimum wages or social security/social fund contributions, by paying them subsequently to the entitled recipient.

7.5 WIEGEL Parey is entitled to prohibit the further deployment of a subcontractor with immediate effect if the contractor does not prove, at the request of WIEGEL Parey, that it has ensured compliance with the obligations under clauses 15 and 17 by means of agreements with the subcontractor. The prohibition may be revoked with effect for the future if the subcontractor undertakes to comply with these provisions and this is proven to WIEGEL Parey.

7.6 The contractor assigns all claims for defects against its subcontractors and suppliers to WIEGEL Parey by way of security. The contractor remains entitled to enforce and collect its claims for defects in its own name and is authorised to conduct proceedings in its own name on behalf of another (gewillkürte Prozessstandschaft) as long as and insofar as the contractor is entitled to subsequent performance towards WIEGEL Parey. Subject to the condition precedent that and insofar as the contractor has fulfilled the claims for defects of WIEGEL Parey, WIEGEL Parey reassigns the contractor’s claims for defects to the contractor.

The above applies accordingly to the contractor’s claims for performance against its subcontractors and suppliers.

8. Bearing of risk/liability

8.1 The bearing of risk is determined solely in accordance with § 644 BGB.

8.2 Unless otherwise regulated in these AVB-Bau, claims for damages by the contractor, irrespective of the legal grounds, in particular for breach of obligations arising from the contractual relationship and in tort, are excluded.

8.3 The exclusion of liability under clause 8.2 does not apply insofar as liability exists

  • a)under the German Product Liability Act,
  • b)in the case of intent,
  • c)in the case of gross negligence,
  • d)in the case of fraudulent intent,
  • e)in the case of non-compliance with a guarantee given,
  • f)for injury to life, body or health, or
  • g)for breach of obligations whose fulfilment makes the proper performance of the contract possible in the first place and on whose fulfilment the contractor may rely according to the purpose and content of the contract (material contractual obligations).

However, the claim for damages for breach of material contractual obligations is limited to the foreseeable damage typical for the contract, unless another of the aforementioned cases applies at the same time.

8.4 The above provisions do not entail a change in the burden of proof to the detriment of the contractor.

9. Securities

9.1 §§ 232 to 240 BGB apply to securities to be provided by the contractor, unless otherwise stipulated in the following provisions or in § 17 VOB/B.

9.2 Performance security

  • a)An agreed performance security must secure the timely and complete performance of the contract by the contractor. The purpose of this performance security covers all claims of WIEGEL Parey against the contractor arising from the contract, including in particular claims for damages due to non-performance or defective performance and claims due to late performance (for example any agreed contractual penalty or claims for damages due to delay), but claims for defects only in respect of defects notified no later than three weeks after acceptance. The purpose of the security also covers claims for repayment of overpayments.
  • b)The performance security must be provided without delay after conclusion of the contract.
  • c)If the contract sum increases after conclusion of the contract due to changes in the scope of services, the contractor must adjust the security to the changed contract sum at the request of WIEGEL Parey. If the contract sum decreases, WIEGEL Parey must return a corresponding part of the security at the contractor’s request. In both cases, a request for adjustment is only permissible if the security is to be increased or returned by at least five per cent.
  • d)A performance security that has not been realised must be returned three weeks after the work has been accepted or WIEGEL Parey has defaulted on acceptance. In the case of partial acceptances, sentence 1 applies with the proviso that the security is to be returned pro rata, so that WIEGEL Parey retains a security whose amount, in relation to the partial services not yet performed, corresponds to the contractually agreed ratio of the amount of the performance security to the contractual value of the total work. Return may be refused as long as an agreed and due security for claims for defects has not been provided or insofar as justified claims covered by the purpose of the security have not yet been fulfilled; in the case of return after a partial acceptance, claims relating to partial services not yet due and not yet performed are disregarded.

9.3 Security for claims for defects

  • a)An agreed security for claims for defects must secure the timely and complete fulfilment of claims for defects of WIEGEL Parey by the contractor. If a performance security has also been agreed, the security for claims for defects secures claims only for defects that are notified for the first time later than three weeks after acceptance.
  • b)The security for claims for defects must be provided without delay after acceptance. In the case of partial acceptances, the security must be provided in an amount which, in relation to the contractual value of the partial services not yet accepted, corresponds to the contractually agreed ratio of the amount of the security for claims for defects to the contractual value of the total work.
  • c)A security for claims for defects that has not been realised must be returned when the agreed limitation period for claims for defects (hereinafter: period) has expired. If different periods apply to the secured claims, the security must be returned pro rata after expiry of each period, so that WIEGEL Parey retains a security whose amount, in relation to the contractual value of the parts of the work whose periods have not yet expired, corresponds to the contractually agreed ratio of the amount of the security for claims for defects to the contractual value of the total work. Insofar as justified claims covered by the purpose of the security have not yet been fulfilled and are not time-barred, WIEGEL Parey may retain a corresponding part of the security.

9.4 Types of security

  • a)At its option, the contractor may provide the securities by guarantee, by payment into a blocked account at a financial institution to be chosen by the contractor, over which WIEGEL Parey and the contractor can only dispose jointly, or by deposit in a lawyer’s or notary’s escrow account. The costs of the security are borne by the contractor. Any interest is due to the contractor. The contractor may replace one security with another.
  • b)If the contractor provides the security by guarantee, the guarantee must be issued by a suitable guarantor (§ 239 BGB). The guarantee must expressly secure the claims to be secured as agreed, contain a waiver of the defence of prior action, contain a waiver of the defence of set-off with the exception of undisputed counterclaims or counterclaims established by a final court decision, and must not be limited in time or conditional. Release of the guarantor by depositing the guaranteed amount must be excluded. The guarantee must contain the declaration that claims of WIEGEL Parey under the guarantee do not become time-barred before the secured claims of WIEGEL Parey become time-barred, but at the latest 30 years after the beginning of the statutory limitation period of the guarantee claim. The guarantee relationship must be governed by German law. The declaration of guarantee must be issued in writing or, if the guarantee is a commercial transaction for the guarantor, in text form. If a security provided by guarantee is to be returned in part, this may be done by a declaration of release by WIEGEL Parey.

9.5 If the contractor does not provide an agreed security in time, WIEGEL Parey may create the security by withholding payments due. If no payment claims required to reach the agreed amount of security are due, WIEGEL Parey may set the contractor a reasonable deadline for providing the security. If this deadline expires without result, WIEGEL Parey may terminate the contract by analogous application of § 648a BGB.

10. Termination

10.1 In addition to the grounds for termination provided for in § 8 VOB/B and §§ 648, 648a BGB, WIEGEL Parey is entitled to terminate for good cause in particular if

  • a)the contractor offers, promises or grants advantages to persons on the part of WIEGEL Parey who are involved in the preparation, conclusion or performance of the contract, or to persons close to them; such acts of the contractor are equivalent to acts of persons authorised, commissioned or working for it; it is irrelevant whether such advantages were offered or promised directly to the persons or to a third party in their interest;
  • b)the contractor breaches its obligations under clause 6.1 sentence 1 or does not fulfil its obligations under clauses 5.1 to 5.4, 6.2, 6.4, 6.5 or 17.1;
  • c)the contractor has repeatedly been in default with contractual deadlines.

10.2 WIEGEL Parey may limit an ordinary or extraordinary termination to a separable part of the services. Separability is not precluded by the fact that services of the same kind as the terminated partial services are still to be performed in other spatial areas covered by the contract, as long as the terminated services have no actual points of contact with the services of the same kind still to be performed.

11. Acceptance

After completion of all of the contractor’s services, a formal acceptance takes place. Any partial acceptances must also be carried out formally within the meaning of § 12 (4) VOB/B. Deemed acceptance under § 12 (5) nos. 1 and 2 is excluded.

12. Invoices, payments

12.1 Invoices are issued exclusively electronically. Invoices must contain the information required under § 14 (4) of the German VAT Act (UStG) and the order numbers specified by WIEGEL Parey, must be verifiable and must contain the description of the services, stating the construction project, as well as the proofs of performance countersigned by WIEGEL Parey and material certificates. If WIEGEL Parey is the tax debtor under VAT law, the following addition must be included on the invoices: “Reverse charge: tax liability of the recipient of the service.”

12.2 Invoices for agreed partial services must bear a corresponding note; interim invoices must be designated as such. Payments on these partial or interim invoices do not constitute acceptance of these partial services.

12.3 WIEGEL Parey is entitled to deduct a cash discount of three per cent from each payment if WIEGEL Parey pays the justified invoice amount within 14 calendar days of the beginning of the payment period.

12.4 Payments are made by cheque or SEPA bank transfer. Discount and payment periods are observed and are timely if the cheque has been sent by post at the latest on the due date or the transfer has been ordered at the bank maintaining the account of WIEGEL Parey before the deadline expires.

12.5 WIEGEL Parey does not owe any interest on amounts due

13. Prohibition of assignment/pledging, set-off, rights of retention

13.1 The assignment or contractual pledging of claims of the contractor arising from the contract is excluded. If an assignment made nevertheless is effective in accordance with § 354a HGB, WIEGEL Parey may make payment to the contractor with discharging effect.

13.2 The contractor is entitled to rights of set-off or retention only if its counterclaims have been established by a final court decision or are undisputed, or if its counterclaims are based on the same contractual relationship.

13.3 Should a dispute arise between the parties due to incomplete payment of interim invoices and the contractor wish to suspend the services or terminate the contract due to default in payment, WIEGEL Parey may avert the right to refuse performance and the right of termination by paying 75 per cent of the disputed amount. At the request of WIEGEL Parey, the contractor must secure this payment in full by handing over a guarantee that meets the requirements of clause 9.4 (b).

13.4 The right of avoidance under clause 13.3 does not apply insofar as the disputed payment obligation has been established by a court, including provisionally by an interim injunction. There is no right to refuse performance or right of termination insofar as the disputed payment obligation has been denied by a court, including provisionally by an interim injunction. Nor is there a right to refuse performance or right of termination as long as summary court proceedings initiated by the contractor concerning the disputed payment are pending.

13.5 Insofar as the justification of the disputed payment claim is established by a provisional court decision after the payment has been made, WIEGEL Parey returns the corresponding part of the security provided in accordance with clause 13.3 sentence 2; insofar as it is denied, the contractor repays the payment received in accordance with clause 13.3 sentence 1 and then receives back the corresponding part of the security.

13.6 Insofar as the disputed payment obligation proves to be justified following an agreement between the contracting parties or by a final and binding court decision, WIEGEL Parey reimburses the contractor for the costs of the guarantee in the amount of the usual costs of providing security up to a maximum rate of two per cent per year; insofar as it proves to be unjustified, the contractor bears the costs of the guarantee itself and pays interest on the amount to be repaid at nine percentage points above the base interest rate per year from the date of payment.

14. Rights in the event of defects

14.1 Rights in the event of defects become time-barred within the statutory period plus two months. § 13 (4) no. 2 VOB/B does not apply.

14.2 § 13 (5) VOB/B applies with the proviso that the request of WIEGEL Parey under § 13 (5) para. 1 sentences 1 and 2 VOB/B may be made in text form.

14.3 In the event of defects, the contractor must also remedy, at its own expense, the consequential damage resulting from the remedying of defects and bear all expenses for restoring the condition that would have existed had the work been executed free of defects, in particular for removing and reinstalling its services.

14.4 When remedying defects, the contractor must also coordinate with WIEGEL Parey and, where applicable, other trades still working on the construction site. Once completed, the work to remedy defects must be formally accepted.

14.5 Special circumstances within the meaning of §§ 281 (2), 323 (2) no. 3, 440 sentence 1, 636, 637 (2) sentence 1 BGB that make it unnecessary to set a deadline exist in particular in urgent cases, e.g. if waiting for a deadline would itself cause WIEGEL Parey to be in default towards its customer.

14.6 For faults in the contractor’s products that are attributable to the contractor’s fault, the contractor indemnifies WIEGEL Parey against the resulting producer liability to the extent that it would itself be directly liable.

14.7 Further or other statutory claims, in particular due to defects or product faults, remain unaffected.

15. Industrial property rights and copyrights

15.1 The contractor guarantees that no industrial property rights or copyrights of third parties conflict with the contractually agreed use of the services. It indemnifies WIEGEL Parey against all claims arising from the infringement of such property rights and must reimburse WIEGEL Parey for the necessary expenses incurred as a result of the claims.

15.2 Ownership rights and copyrights to the illustrations, plans, drawings, calculations, cost estimates and other physical or digital documents (hereinafter: documents) provided to the contractor by WIEGEL Parey pass to the contractor only by express agreement. The documents must be kept confidential, used exclusively for the performance of the contractual services and returned without being asked after performance of the services or other termination of the contract.

15.3 WIEGEL Parey is entitled to use, reproduce and modify all planning and other services of the contractor as well as the documents to be submitted by it comprehensively for the construction project that is the subject of the contract – also in the event of premature termination of the contract. The transfer of these rights of use is covered by the contractual remuneration.

16. Contractual penalty for default, damages for delay

16.1 If a contractual penalty has been agreed for default with the completion date, the contractor forfeits, for each calendar day of default with the completion date, a contractual penalty of 0.15 % of its total net remuneration claim (before allocations and reductions due to defects). The contractual penalty for exceeding the completion date is limited to 5 % of the total net remuneration claim (before allocations and reductions due to defects).

16.2 If a contractual penalty has been agreed for default with other contractual deadlines, the contractor forfeits, for each calendar day of default with an interim deadline subject to a contractual penalty, a contractual penalty of 0.15 % of the part of its net remuneration claim attributable to the services to be performed by the interim deadline (before allocations and reductions due to defects). The contractual penalty for exceeding an interim deadline is limited to 5 % of the part of the net remuneration claim attributable to the services to be performed by the interim deadline (before allocations and reductions due to defects). A contractual penalty forfeited for exceeding an interim deadline is offset against contractual penalties subsequently forfeited for exceeding interim deadlines or the completion date.

16.3 If the contracting parties agree new binding contractual deadlines after conclusion of the contract, the agreed contractual penalties also apply to these newly agreed deadlines. The same applies to postponements of deadlines in accordance with § 6 (2) and (4) VOB/B.

16.4 WIEGEL Parey may declare the reservation of the contractual penalty until the final payment claim falls due, but at the latest until the final payment.

16.5 The damage to be compensated by the contractor in the event of default also includes lost profit – the restrictions of § 6 (6) VOB/B do not apply in this respect.

17. Data protection

17.1 Each contracting party is obliged towards the other contracting party to comply with the applicable statutory data protection provisions and not to collect, process or use personal data for purposes or to an extent other than those required under this contract.

17.2 Information on data protection and on the processing of personal data by WIEGEL Parey is available at the internet address /datenschutz/ .

18. Working days, business days

Business days within the meaning of the contract and its components are all days of the week except Sundays and public holidays at the location of the construction project. Working days are all business days except Saturdays.

19. Jurisdiction and applicable law

19.1 The exclusive place of jurisdiction for all disputes arising directly or indirectly from the contractual relationship is the registered office of WIEGEL Parey if the contractor is a merchant, a legal entity under public law or a special fund under public law. However, WIEGEL Parey is also entitled to bring an action at the registered office of the customer. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

19.2 This contract, including its interpretation, is governed by the law of the Federal Republic of Germany, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

20. Severability clause

Should one of the provisions of these AVB-Bau or of the other parts of the contract be invalid, or should the contract, including these AVB-Bau, contain a gap in its entirety, the validity of the remaining contractual provisions is not affected. Insofar as the invalidity of the contractual provision is not due to statutory provisions serving to protect a contracting party, the invalid provision is replaced by a valid one and a missing one is inserted in such a way that the intention of the contracting parties expressed in the contract and the purpose of the contract are met as far as possible.

Terms and conditions of purchase

Terms and conditions of purchase of WIEGEL Parey GmbH & Co KG (lattice mast construction)

Version: October 2019

1. Scope of the terms and conditions of purchase

1.1 All enquiries, orders and agreements (including future ones) under which the main performance obligation of WIEGEL Parey consists of a payment obligation are based exclusively on the following terms. In the case of construction contracts, the German General Contract Terms for the Execution of Construction Work (VOB/B) in the version published at the time the contract is concluded apply in addition and subordinate to these terms and conditions of purchase.

1.2 These terms and conditions of purchase apply exclusively. Conflicting or additional terms of the contractor to which WIEGEL Parey has not expressly agreed in writing do not apply. The acceptance of deliveries or services and payments do not constitute consent. WIEGEL Parey expressly objects to the validity of such terms of the contractor that have not been expressly agreed, also for the future.

1.3 These terms and conditions of purchase do not apply to consumers or insofar as individually negotiated deviating agreements have been made.

2. Order, order confirmation

2.1 All agreements become binding only upon the written order of WIEGEL Parey. Changes and additions to the order are only effective if they have been confirmed in writing by WIEGEL Parey.

2.2 The contractor is obliged to inform WIEGEL Parey without delay of any errors (including obvious ones), typing and calculation errors it identifies in the documents, drawings and plans submitted by WIEGEL Parey so that the order of WIEGEL Parey can be corrected. This also applies to missing documents or drawings.

2.3 The contractor is obliged to treat the orders of WIEGEL Parey and all related commercial and technical details as trade secrets.

2.4 After receipt of the order, the contractor sends WIEGEL Parey without delay a confirmation of the delivery/service to be provided, stating the delivery or completion date. Deviations from the order conditions are not accepted.

3. Scope of delivery/services

3.1 The contractor is obliged and warrants to meet the specifications laid down in the enquiries and orders of WIEGEL Parey as well as its own information that has become part of the contract, and to comply with all agreed or relevant standards and regulations (e.g. DIN/EN/ISO/VOB/C/VDE) and the generally recognised rules of technology when carrying out the deliveries and services.

3.2 Deliveries and services must comply with the laws, ordinances and regulations applicable at the time of performance or default of acceptance.

3.3 The contractor guarantees that no materials are used or installed in the deliveries/services that are harmful to the environment, particularly in the event of fire (quality guarantee).

3.4 For substances or mixtures to be supplied by the contractor for which a safety data sheet must be prepared under the REACH Regulation (Regulation (EC) 1907/2006) or the German Hazardous Substances Ordinance (GefStoffV), or for which the contractor has information obligations towards the buyer, the contractor must hand over the safety data sheets or safety information (in particular under § 5 GefStoffV and Art. 32 REACH Regulation) to us without delay after conclusion of the contract. Safety data sheets must also be handed over to us without being asked for the mixtures referred to in Art. 31 (3) REACH Regulation. In the event of changes within the meaning of Art. 31 (9) or Art. 32 (3) REACH Regulation, the contractor hands over updated safety data sheets or information sheets to us without delay and without being asked.

4. Changes to the services

4.1 The contractor must notify without delay any changes to the agreed services, including additional services, that become necessary during performance of the contract. They require the prior written consent of WIEGEL Parey.

4.2 Insofar as the contractor owes, under the contract, the manufacture or modification of an item or another result to be brought about by work or service, WIEGEL Parey is entitled to order changes by analogous application of § 650b BGB, whereby the change order need not be preceded by a change request. The contractor’s payment claim is adjusted in accordance with § 650c (1) BGB, insofar as WIEGEL Parey does not agree with the contractor on the amount of the adjustment of the payment claim. The contractor submits a supplementary offer to WIEGEL Parey without delay after the change order.

5. Execution of deliveries/services

5.1 Insofar as non-harmonised construction products are to be supplied or processed and nothing to the contrary has been expressly agreed, the construction products supplied or to be processed must meet the requirements of the applicable model administrative regulation on technical building rules (MVV TB) of the DIBt; the manufacturer’s declarations, certificates or test certificates required thereunder must be handed over to WIEGEL Parey at the latest upon delivery or before processing. Insofar as harmonised construction products are to be supplied or processed, the contractor may only use products bearing a CE marking; the contractor must hand over the corresponding declarations of performance for the products to WIEGEL Parey at the latest upon delivery or before processing.

5.2 Delivery is made delivered duty paid (DDP, Incoterms 2010).

5.3 The contractor must notify WIEGEL Parey of the dispatch in text form at the latest when the goods are handed over to the carrier. In the shipping documents, the contractor must state all order details in accordance with the specifications of the order (order number, order date, delivery point, etc.) as well as the content of the delivery and the date of dispatch. If this information is missing and delays or costs arise as a result, these are borne by the contractor.

5.4 WIEGEL Parey is entitled to return reusable packaging to the contractor against remuneration resulting from the invoice. However, there is no obligation to return the packaging.

5.5 In the event of discrepancies between the invoiced weight and the weight on receipt, the weight determined by WIEGEL Parey on notification of receipt applies, unless the contractor proves that the weight stated by it was correctly determined. This applies analogously to quantities.

5.6 Confirmations of receipt and the countersigning of proofs of performance do not constitute acceptance of the services described therein.

5.7 Material provided remains the property of WIEGEL Parey. It must be stored separately as such, marked as the property of WIEGEL Parey and may only be used for orders of WIEGEL Parey. The contractor is liable for any reduction in value or loss even without fault.

6. Subcontractors, deployment of employees

6.1 The transfer of the performance obligations assumed by the contractor to subcontractors requires the prior written consent of WIEGEL Parey.

6.2 If the contractor or a subcontractor commissioned by it deploys foreign nationals for the performance of services or work owed by the contractor whose employment requires a permit under § 4 (3) AufenthG or § 284 (1) SGB III, it must give WIEGEL Parey the names of these employees and submit the required permit before they are deployed.

6.3 Insofar as the contractor owes the performance of services or work, it undertakes towards WIEGEL Parey, with regard to the employees deployed for this purpose, to comply with the applicable legal provisions on the remuneration of its workers, the granting of working conditions and the fulfilment of obligations under accident insurance and social security law. If services under this contract are passed on or employees are hired, the contractor will expressly oblige its subcontractors and temporary employment agencies to comply with these obligations and to pass them on in identical terms. The contractor indemnifies WIEGEL Parey against all claims that an employee deployed by it or one of its subcontractors, or a social security institution, justifiably asserts against WIEGEL Parey due to the breach of the obligations stated in sentence 1, e.g. under § 14 AEntG, § 13 MiLoG, § 98a AufenthG, § 28e SGB IV or § 150 (3) SGB VII, and compensates WIEGEL Parey for all damage incurred by WIEGEL Parey as a result of such claims.

6.4 If the contractor breaches an obligation under clause 4.1 or 4.2 or 4.3 sentence 1 of these terms and conditions of purchase, we have the right to withdraw from the contract or to terminate the contract extraordinarily without notice; claims for damages remain unaffected.

7. Performance/delivery dates, default of acceptance

7.1 The timeliness of deliveries is determined by receipt at the receiving point specified by WIEGEL Parey. In the case of deliveries with erection and/or assembly and in the case of work services, completion ready for acceptance is decisive.

7.2 Deliveries before the agreed delivery date may be rejected by WIEGEL Parey.

7.3 The contractor is obliged to inform WIEGEL Parey of delays in text form without delay as soon as they become known.

7.4 In the event of default in delivery by the contractor, the contractor owes WIEGEL Parey lump-sum damages of 0.2 % of the contractual value of the services affected by the default per working day, but no more than 5 % of the contractual value; both contracting parties reserve the right to prove higher or lower damage. In addition, after expiry of a reasonable period set for subsequent performance, WIEGEL Parey is entitled to have the service not yet provided by the contractor performed by a third party at the contractor’s expense. Further statutory or agreed rights remain unaffected.

7.5 The statutory provisions apply to the occurrence of default of acceptance by WIEGEL Parey. However, the contractor must also offer its performance to WIEGEL Parey in accordance with §§ 294, 295 BGB, in particular request WIEGEL Parey to perform the necessary act, if the performance requires an act for which a calendar date is specified or which must be preceded by an event and a reasonable time for the act is specified in such a way that it can be calculated by the calendar from the event.

8. Prices

8.1 If the contractor also owes assembly and subsequent services (e.g. commissioning, trial operation), the agreed prices also include all related costs (e.g. intermediate transport, storage, deployment of workers and equipment, etc.).

8.2 If WIEGEL Parey has to bear the freight by express agreement, the contractor must choose the mode of transport prescribed by WIEGEL Parey, otherwise the mode of transport and delivery most favourable for WIEGEL Parey.

8.3 If, by express agreement, packaging is not included in the price, packaging must be charged at cost price. The contractor must choose the packaging specified by WIEGEL Parey and ensure that the packaging protects the goods from damage.

9. Terms of payment

9.1 Payment claims fall due at the earliest after delivery or completion and acceptance of the respective service. Statutory or agreed rights to interim payments remain unaffected.

9.2 Invoices are issued exclusively electronically. WIEGEL Parey agrees to receive electronic invoices. Invoices must contain the information required under § 14 (4) UStG and the order numbers specified by WIEGEL Parey, must be verifiable and must contain the description of the deliveries and/or services, in the latter case stating the property concerned, as well as the proofs of performance countersigned by WIEGEL Parey and material certificates. If WIEGEL Parey is the tax debtor under VAT law, the following addition must be included on invoices: “Reverse charge: tax liability of the recipient of the service.”

9.3 Invoices for agreed partial services must bear a corresponding note; interim invoices must be designated as such. Payments on these partial or interim invoices do not constitute acceptance of these partial services.

9.4 For steel deliveries, payment is made on the 15th of the second month following delivery and receipt of the invoice; otherwise within 30 days net or less 3 % cash discount within 10 days of receipt of the invoice and delivery and/or completion and acceptance of the service; in the case of invoices for construction work, also less 0.3 % of the invoice amount for construction all-risk insurance, insofar as WIEGEL Parey has taken out such insurance that also covers the contractor’s services.

9.5 Insofar as invoices are wholly or partly not verifiable or do not comply with the contractual agreements, WIEGEL Parey is entitled to withhold the corresponding invoice amounts. WIEGEL Parey will request the contractor to comment without delay. After clarification, WIEGEL Parey will pay the amounts withheld, insofar as they have been justifiably claimed by the contractor, within the payment periods stated in clause 9.3. If the contractor is responsible for the delay caused by such checks, inter alia due to missing or incomplete information and/or documents, the payment periods are interrupted for the period of the delay.

9.6 Payments do not constitute acknowledgement of the deliveries or services as complete or in conformity with the contract.

9.7 Payments are made by SEPA bank transfer. Discount and payment periods are observed if the transfer has been ordered on the due date at the bank maintaining the account of WIEGEL Parey.

9.8 WIEGEL Parey does not owe any interest on amounts due.

9.10 WIEGEL Parey is only in default if WIEGEL Parey does not pay after a reminder from the contractor issued after the price has fallen due. The annual default interest in the event of default in payment is 5 percentage points above the base interest rate.

10. Prohibition of assignment/pledging, set-off, rights of retention

10.1 The assignment or contractual pledging of claims of the contractor arising from the contract is excluded. If an assignment made nevertheless is effective in accordance with § 354a HGB, WIEGEL Parey may make payment to the contractor with discharging effect.

10.2 The contractor is entitled to rights of set-off or retention only if its counterclaims have been established by a final court decision or are undisputed, or if its counterclaims are based on the same contractual relationship. WIEGEL Parey is entitled to avert the exercise of a right of retention by providing security – including by way of a guarantee.

11. Obligation to inspect and give notice of defects

11.1 Insofar as WIEGEL Parey is subject to obligations to inspect and give notice of defects under § 377 HGB, defects are in any case deemed to have been notified without delay within the following periods:

  • in the case of obvious defects, if the notification reaches the contractor three working days after delivery;
  • in the case of defects that only become apparent during a proper inspection, if the notification reaches the contractor two weeks after delivery;
  • in the case of hidden defects, if the notification reaches the contractor two weeks after discovery of the defect.

11.2 In the case of agreed delivery to a third-party merchant, sentence 1 applies with the proviso that the periods for defects that are not hidden begin with delivery to the third party.

11.3 In the case of agreed delivery to a third party who is not a merchant, defects are in any case deemed to have been notified in time if the notification reaches the contractor two weeks after WIEGEL Parey has become aware of the defect.

12. Liability for defects

12.1 Notwithstanding § 442 (1) sentence 2 BGB, WIEGEL Parey is entitled to rights in the event of defects even if the defect remained unknown to WIEGEL Parey at the time the contract was concluded as a result of gross negligence.

12.2 In the case of steel deliveries, the contractor warrants, irrespective of the state of processing, that only steels in accordance with DIN EN 1090 are delivered or used. The 3.1 inspection certificates in accordance with DIN/EN 10204 must be submitted or handed over to WIEGEL Parey at the time the goods are delivered.

12.3 Claims for defects become time-barred after 5 years plus 2 months.

12.4 Subsequent performance is effected, at the option of WIEGEL Parey, by rectification or replacement delivery or new production. Insofar as the contractor owes the assumption of the costs of removing and reinstalling the item under § 439 (3) BGB, it is obliged, at the request of WIEGEL Parey, to remove the defective item at its own expense and to reinstall it after subsequent performance.

12.5 Special circumstances within the meaning of §§ 281 (2), 323 (2) no. 3, 440 sentence 1, 636, 637 (2) sentence 1 BGB that make it unnecessary to set a deadline exist in particular in urgent cases, e.g. if waiting for a deadline would itself cause WIEGEL Parey to be in default towards its customer.

12.6 For faults in the contractor’s products that are attributable to the contractor’s fault, the contractor indemnifies WIEGEL Parey against the resulting producer liability to the extent that it would itself be directly liable.

12.7 Further or other statutory claims, in particular due to defects or product faults, remain unaffected.

13. Property rights, rights to documents

13.1 The contractor guarantees that no industrial property rights or copyrights of third parties conflict with the contractually agreed use of the deliveries/services. It indemnifies WIEGEL Parey and its buyers against all claims arising from the infringement of such property rights and must reimburse WIEGEL Parey for the necessary expenses incurred as a result of the claims.

13.2 Ownership rights and copyrights to the illustrations, plans, drawings, cost estimates, calculations and other documents provided to the contractor by WIEGEL Parey do not pass to the contractor. The documents must be kept confidential, used exclusively for production on the basis of the order of WIEGEL Parey and returned without being asked after performance of the service or other termination of the contract.

14. Termination

WIEGEL Parey is entitled to terminate the contract for good cause with immediate effect. Good cause exists in particular if

  • the contractor stops making payments to its suppliers or subcontractors,
  • the contractor or, admissibly, a creditor applies for the opening of insolvency proceedings or comparable proceedings concerning the contractor’s assets, such proceedings are opened or their opening is rejected for lack of assets,
  • the contractor breaches contractual obligations several times or repeatedly.

Other statutory rights of termination and claims remain unaffected.

15. Securities

The following applies to contractually agreed securities:

15.1 §§ 232 to 240 BGB apply to the provision of security, unless otherwise stipulated in the following provisions.

15.2 Performance security

15.2.1 An agreed performance security must secure the timely and complete performance of the contract by the contractor. The purpose of this performance security covers all claims of WIEGEL Parey against the contractor arising from the contract, including in particular claims for damages due to non-performance or defective performance and claims due to late performance (for example any agreed contractual penalty or claims for damages due to delay), but claims for defects only in respect of defects notified no later than three weeks after acceptance. The purpose of the security also covers claims for repayment of overpayments.

15.2.2 The performance security must be provided without delay after conclusion of the contract.

15.2.3 If the contract sum increases after conclusion of the contract due to changes in the scope of services, the contractor must adjust the security to the changed contract sum at the request of WIEGEL Parey. If the contract sum decreases, WIEGEL Parey must return a corresponding part of the security at the contractor’s request. In both cases, a request for adjustment is only permissible if the security is to be increased or returned by at least five per cent.

15.2.4 A performance security that has not been realised must be returned three weeks after the work has been accepted or WIEGEL Parey has defaulted on acceptance. In the case of agreed or accepted partial services, sentence 1 applies with the proviso that the security is to be returned pro rata, so that WIEGEL Parey retains a security whose amount, in relation to the partial services not yet performed, corresponds to the contractually agreed ratio of the amount of the performance security to the contractual value of the total work. Return may be refused as long as an agreed and due security for claims for defects has not been provided or insofar as justified claims covered by the purpose of the security have not yet been fulfilled; in the case of return after partial services have been performed, claims relating to partial services not yet due and not yet performed are disregarded.

15.3 Security for claims for defects

15.3.1 An agreed security for claims for defects must secure the timely and complete fulfilment of claims for defects of WIEGEL Parey by the contractor. If a performance security has also been agreed, the security for claims for defects secures claims only for defects that are notified for the first time later than three weeks after acceptance.

15.3.2 The security for claims for defects must be provided without delay after acceptance. In the case of acceptance of partial services, the security must be provided in an amount which, in relation to the contractual value of the partial services not yet accepted, corresponds to the contractually agreed ratio of the amount of the security for claims for defects to the contractual value of the total work.

15.3.3 A security for claims for defects that has not been realised must be returned when the agreed limitation period for claims for defects (hereinafter: period) has expired. If different periods apply to the secured claims, the security must be returned pro rata after expiry of each period, so that WIEGEL Parey retains a security whose amount, in relation to the contractual value of the parts of the work whose periods have not yet expired, corresponds to the contractually agreed ratio of the amount of the security for claims for defects to the contractual value of the total work. Insofar as justified claims covered by the purpose of the security have not yet been fulfilled and are not time-barred, WIEGEL Parey may retain a corresponding part of the security.

15.4 Types of security

15.4.1 At its option, the contractor may provide the securities by guarantee, by payment into a blocked account at a financial institution to be chosen by the contractor, over which WIEGEL Parey and the contractor can only dispose jointly, or by deposit in a lawyer’s or notary’s escrow account. The costs of the security are borne by the contractor. Any interest is due to the contractor. The contractor may replace one security with another.

15.4.2 If the contractor provides the security by guarantee, the guarantee must be declared by a suitable guarantor (§ 239 BGB). The guarantee must expressly secure the claims to be secured as agreed, contain a waiver of the defence of prior action, contain a waiver of the defence of set-off with the exception of undisputed counterclaims or counterclaims established by a final court decision, and must not be limited in time or conditional. Release of the guarantor by depositing the guaranteed amount must be excluded. The guarantee must contain the declaration that claims of WIEGEL Parey under the guarantee do not become time-barred before the secured claims of WIEGEL Parey become time-barred, but at the latest 30 years after the beginning of the statutory limitation period of the guarantee claim. The guarantee relationship must be governed by German law. The declaration of guarantee must be issued in writing or, if the guarantee is a commercial transaction for the guarantor, in text form. If a security provided by guarantee is to be returned in part, this may be done by a declaration of release by WIEGEL Parey.

15.5 If the contractor does not provide an agreed security in time, WIEGEL Parey may create the security by withholding payments due. If no payment claims required to reach the agreed amount of security are due, WIEGEL Parey may set the contractor a reasonable deadline for providing the security. If this deadline expires without result, WIEGEL Parey may withdraw from or terminate the contract.

16. Jurisdiction and choice of law

16.1 If the contractor is a merchant, the place of jurisdiction is the registered office of our company. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

16.2 The law of the Federal Republic of Germany applies exclusively, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

17. Data protection

Information on data protection and on the processing of personal data by WIEGEL Parey is available at the internet address /datenschutz/.

18. Severability clause

Should one of the provisions of these terms and conditions of purchase or of the other parts of the contract be invalid, or should the contract, including these terms and conditions of purchase, contain a gap in its entirety, the validity of the remaining contractual provisions is not affected. Insofar as the invalidity of the contractual provision is not due to statutory provisions serving to protect a contracting party, the invalid provision is replaced by a valid one and a missing one is inserted in such a way that the intention of the contracting parties expressed in the contract and the purpose of the contract are met as far as possible.

Tele­communi­cations construction
General Terms of Delivery

General Terms of Delivery
of TKS Tele­kommu­nikations­bau Services GmbH

Version: September 2019

1. Scope of these General Terms of Delivery

These General Terms of Delivery apply exclusively to the legal relationship between TKS Tele­kommu­nikations­bau Services GmbH (hereinafter: TKS) and the customer not acting as a consumer of deliveries and/or services of TKS (hereinafter: deliveries), unless the contract is a construction contract. General terms and conditions of the customer apply only insofar as TKS has expressly agreed to them in writing. § 305b BGB remains unaffected.

2. Conclusion of the contract

2.1 The offers of TKS are subject to change and non-binding. This also applies if catalogues, technical documentation, drawings, plans, calculations, cost estimates, references to DIN standards or other product descriptions or documents – including in electronic form – are made available to the customer.

2.2 The customer’s order for the deliveries is deemed a binding contractual offer. Unless the order expressly states otherwise, TKS may accept this contractual offer within three weeks of receipt.

3. Creditworthiness, right of revocation/withdrawal

TKS reserves the right to secure the deliveries through a trade credit insurance of its choice. If the trade credit insurer chosen by TKS issues a negative decision due to the customer’s insufficient creditworthiness, the customer is obliged, at the request of TKS, within two weeks and at its own choice, to pay the agreed prices in advance or to provide a suitable guarantor for its payment obligations. If this period expires without result, TKS is entitled, without any obligation to pay compensation to the customer, to revoke offers and other declarations of intent aimed at concluding the contract or to withdraw from a contract already concluded. Withdrawal must be declared no later than one month after conclusion of the contract.

4. Prices, terms of payment, set-off and rights of retention

4.1 Prices are ex works plus the statutory value added tax applicable at the time. Invoicing is based on the theoretical weight of the circumscribing rectangle plus a 4 % surcharge for galvanizing and rolling tolerances (1 %).

4.2 If TKS has undertaken assembly or service work and nothing else has been agreed, the customer reimburses, in addition to the agreed remuneration, the necessary incidental costs such as travel and transport costs as well as allowances upon proof.

4.3 All invoices are to be paid without deduction within 14 days of receipt of the invoice and delivery or acceptance.

4.4 If a cash discount is agreed for payment within a certain discount period, this period is only observed if the justified invoice amount has been received in full by TKS within the agreed discount period. The discount period begins with the payment period in accordance with 4.3.

4.5 The customer is entitled to rights of set-off or retention only if its counterclaims have been established by a final court decision or are undisputed, or if its counterclaims are based on the same contractual relationship. TKS is entitled to avert the exercise of a right of retention by providing security – including by way of a guarantee.

5. Retention of title and other security rights

5.1 The items delivered (hereinafter: reserved goods) remain the property of TKS until all payment claims to which TKS is entitled against the customer under the contract and an ongoing business relationship have been fulfilled.

5.2 As long as the retention of title exists, the customer is prohibited from pledging the reserved goods or transferring them by way of security.

5.3 Subject to revocation, the customer is authorised in accordance with the following conditions to resell and/or process the reserved goods in the ordinary course of business:

  • a)The retention of title extends to the products resulting from the processing, mixing or combining of the reserved goods at their full value, with TKS being deemed the manufacturer. Processing is carried out for TKS. The customer keeps the resulting new item for TKS with the care of a prudent merchant and stores it separately and marked as the property of TKS. The new item is deemed reserved goods. If, in the case of mixing or combining with goods of third parties, their right of ownership remains, TKS acquires co-ownership in the ratio of the invoice values of the mixed or combined goods. Otherwise, the same applies to the resulting product as to the reserved goods.
  • b)The customer hereby assigns to TKS by way of security the claims against third parties arising from the resale of the reserved goods or the product, in full or in the amount of any co-ownership share of TKS in accordance with the preceding letter. TKS accepts the assignment.
  • c)The customer remains authorised to collect the claims from the resale alongside TKS. However, TKS may only collect the claims if there is good cause and after asserting the rights under clause 5.5. Good cause exists in particular if the customer is in default of payment to TKS or lacks the ability to perform within the meaning of § 321 BGB. As soon as TKS is entitled to collect the claims, the customer must inform TKS of the assigned claims and their debtors, provide all information required for collection, hand over the associated documents and notify the debtors (third parties) of the assignment. In this case, TKS is also entitled to revoke the customer’s authorisation to resell and process the reserved goods.

5.4 In the event of attachments, seizures or other dispositions or interventions by third parties, the customer must notify TKS in writing without delay. If a legitimate interest is credibly demonstrated, the customer must provide TKS without delay with the information required to assert its rights against the customer’s client and hand over the necessary documents.

5.5 In the event of breaches of duty by the customer, in particular default in payment, TKS is entitled, after a reasonable period set for the customer to perform has expired without result, unless such a period is dispensable under statutory or contractual provisions, to withdraw from the contract in accordance with the statutory provisions and/or to demand return of the reserved goods on the basis of the retention of title. Unless declared otherwise, the demand for return does not constitute a withdrawal from the contract.

5.6 Insofar as the value of all security rights to which TKS is entitled exceeds the amount of all secured claims by more than 10 %, TKS will release the excess part of the security rights at the customer’s request.

6. Delivery periods and default

6.1 Compliance with agreed delivery periods requires the timely receipt of all documents, necessary permits and approvals to be supplied by the customer, in particular of plans, as well as the timely performance of other acts of cooperation by the customer. If these conditions are not met in time, the periods are extended by the duration of the delay plus a reasonable additional period for resuming performance; this does not apply insofar as TKS is responsible for the delay.

6.2 If non-compliance with the periods is due to circumstances for which TKS is not responsible, in particular

  • a)force majeure or other circumstances that TKS cannot avert, e.g. mobilisation, war, acts of terrorism, riot,
  • b)strike or a lockout ordered by the employers’ professional association in the business of TKS or in a business working directly for it,
  • c)virus and other attacks by third parties on the IT system of TKS, insofar as these occurred despite the care customary in protective measures being exercised,
  • d)impediments due to German, US or other applicable national, EU or international regulations of foreign trade law, or
  • e)failure of its suppliers to supply TKS on time, if TKS has concluded a congruent covering transaction and neither TKS nor the supplier is at fault, or TKS is not obliged to procure in the individual case,

the periods are extended by the duration of the disruption plus a reasonable additional period for resuming performance. TKS will inform the customer of this without delay and at the same time notify it of the expected new delivery period. If delivery is not possible even within the new delivery period for reasons not stated in sentence 1, TKS may withdraw from the contract in whole or in part; TKS will refund without delay any consideration already provided by the customer. The statutory rights, in particular in the event of an exclusion of the obligation to perform (e.g. due to impossibility or unreasonableness of performance and/or subsequent performance), remain unaffected. However, the customer is not entitled to withdraw from the contract for non-compliance with the performance periods if TKS is not responsible for exceeding them.

6.3 At the request of TKS, the customer is obliged to declare within a reasonable period whether it withdraws from the contract due to the delay in delivery or insists on delivery.

6.4 If dispatch or delivery is delayed by more than one month at the customer’s request, if the customer is in default of acceptance or if delivery is delayed for other reasons for which the customer is responsible, the customer must pay lump-sum compensation for the resulting damage and expenses (including additional expenses such as storage costs) of 0.5 % of the price agreed for the deliveries to be dispatched or delivered late for each month of delay or part thereof, beginning with the delivery period or – in the absence of a delivery period – with the notification of readiness for dispatch or collection. The contracting parties remain free to prove higher or lower damage.

7. Terms of delivery, packaging and dispatch

7.1 Unless expressly agreed otherwise or unless the assembly of the items to be delivered by TKS has been agreed, the item to be delivered is made available “ex works” (EXW, Incoterms 2010), but without transport packaging.

7.2 If a place of delivery other than EXW has been agreed, the customer must notify TKS in good time of a shipping address to be determined by it as agreed. Unless otherwise agreed, TKS is entitled to determine the type of dispatch (in particular transport company, shipping route, packaging) at its reasonable discretion.

7.3 The customer may not refuse to accept deliveries because of insignificant defects.

7.4 Partial deliveries not agreed upon are permissible insofar as the partial delivery can be used by the customer within the scope of the contractual purpose, delivery of the remaining goods ordered is ensured and the partial delivery does not cause the customer any significant additional effort or additional costs which TKS has not agreed to bear.

8. Transfer of risk

8.1 The risk of accidental loss and accidental deterioration passes to the customer at the latest upon handover. If delivery is made to a place other than ex works, however, the risk of accidental loss and accidental deterioration as well as the risk of delay pass as soon as the goods are handed over to the forwarder, the carrier or the other person or institution designated to carry out the shipment. Insofar as acceptance has been agreed or is provided for by law, this is decisive for the transfer of risk. It is equivalent to handover or acceptance if the customer is in default of acceptance or if TKS stores the items to be delivered after completion as agreed or at the customer’s request; in the case of storage, the time at which the notice of completion is sent to the customer is decisive.

8.2 At the request and expense of the customer, deliveries are insured by TKS against the usual transport risks.

9. Assembly and other services at the customer’s premises

9.1 TKS owes assembly services, erection and other services such as maintenance, repair or servicing (hereinafter: assembly services) or planning services only if this has been expressly agreed. Unless otherwise agreed, the following provisions apply to these services:

9.2 Before the start of the assembly services, the customer must provide, without being asked, the necessary information on the location of exposed and concealed utility lines (e.g. electricity, gas, water and tele­communication lines) as well as the necessary structural data.

9.3 Before the start of the assembly services, the materials and items to be provided by the customer that are required to begin the work must be at the assembly site, and all preparatory work to be performed by the customer must have progressed to such an extent that assembly can begin as agreed and be carried out without interruption. Access routes and the assembly site must be levelled and cleared.

9.4 If the assembly services are delayed by circumstances for which TKS is not responsible, the customer must bear the costs incurred for waiting time and additional journeys of the assembly personnel, insofar as these could not be avoided. Further claims of TKS in the event of default of acceptance or due to delays for which the customer is responsible remain unaffected.

9.5 The customer must certify to TKS weekly the working hours of the assembly personnel and, without delay, the completion of the assembly services.

9.6 TKS is entitled to have assembly services or planning services performed by subcontractors. The customer may object to the use of a subcontractor if the use of this subcontractor is unreasonable for it and the subcontractor is not an affiliated company of TKS within the meaning of § 15 AktG.

10. Rights in the event of defects

10.1 If the customer can demand subsequent performance due to a defect, TKS has the right to choose whether to remedy the defect by rectification or by new delivery/new production. The right to refuse subsequent performance under the statutory conditions remains unaffected.

10.2 Claims for defects become time-barred 12 months from the statutory commencement of the limitation period. This period does not apply to claims for defects in accordance with §§ 438 (1) no. 2 or 634a (1) no. 2 BGB (for building materials or construction, construction planning or construction supervision services), in the case of recourse in the supply chain of a sale of consumer goods (§ 478 BGB), in the case of intent, fraudulent concealment of the defect or non-compliance with a quality guarantee. The statutory provisions on suspension of expiry (in particular under § 445b (2) BGB), suspension and recommencement of periods remain unaffected.

10.3 Notices of defects by the customer must be made in writing without delay. If the contract is a commercial transaction, § 377 HGB (obligation to inspect and give notice of defects) also applies to contracts other than contracts of sale and contracts for work and materials. The customer must inspect goods intended for installation or other further processing at the latest immediately before processing, unless TKS owes the installation or further processing.

10.4 There is no material defect if there is only an insignificant impairment of suitability for the use presupposed under the contract or for customary use.

10.5 Recourse claims of the customer against TKS in accordance with § 445a BGB (entrepreneur’s recourse) exist only insofar as the customer has not made any agreements with its buyer going beyond the statutory claims for defects.

10.6 Claims for damages by the customer on account of a defect exist only in the cases regulated in clause 13.2. This provision does not entail a change in the burden of proof to the detriment of the customer.

10.7 The provisions of clauses 10.1 to 10.5 do not apply to claims of the customer against TKS under § 445a BGB (seller’s recourse) if the last contract in the supply chain is a sale of consumer goods.

10.8 TKS provides advice to the best of its knowledge on the basis of its own experience, but to the exclusion of any liability. Information and statements on the suitability and application or use of the subject matter of the contract are non-binding unless they are expressly an agreed quality. They do not release the customer from carrying out its own checks.

11. Industrial property rights and copyrights

11.1 Unless otherwise agreed, TKS is obliged to provide the delivery free of industrial property rights and copyrights of third parties (hereinafter: property rights) only in the country of the place of delivery. If a third party asserts justified claims against the customer for infringement of property rights by deliveries made by TKS and used in accordance with the contract, TKS is liable to the customer as follows:

  • a)TKS will, at its option and at its expense, either obtain a right of use for the deliveries concerned, modify them so that the property right is not infringed, or replace them.
  • b)The obligation of TKS to pay damages is governed by clause 13.

11.2 The customer is obliged to notify TKS in writing without delay of the claims asserted by the third party, not to acknowledge an infringement or the existence of claims, and to defend against these claims only in agreement with TKS. If the customer stops using the delivery to mitigate damage or for other important reasons, it is obliged to point out to the third party that the cessation of use does not constitute an acknowledgement of an infringement of property rights.

11.3 Claims of the customer are excluded insofar as it is responsible for the infringement of property rights.

11.4 Claims of the customer are further excluded insofar as the infringement of property rights is caused by special specifications of the customer, by an application not foreseeable by TKS or by the delivery being modified by the customer or used together with products not supplied by TKS.

11.5 Insofar as an existing infringement of property rights also constitutes a material defect or defect of title, the provisions of clauses 10.1 to 10.8 apply accordingly in addition to the above provisions.

11.6 If TKS has to deliver in accordance with specifications, drawings, models, samples or using parts provided by the customer, the customer is liable for ensuring that third-party property rights are not infringed as a result. TKS will inform the customer of property rights known to TKS. The customer indemnifies TKS against all third-party claims and compensates for the damage incurred. If TKS is prohibited by a third party from manufacturing or delivering on the basis of a property right belonging to that third party, TKS is entitled, without examining the legal situation, to stop the work, unless the alleged property rights obviously do not conflict with the manufacture or delivery.

11.7 The property rights to the models, moulds and devices, designs and drawings created by TKS or by a third party on behalf of TKS belong to TKS, even if the customer has borne the costs for them.

12. Rights to documents

12.1 Ownership rights and copyrights to cost estimates, drawings, calculations and other documents (hereinafter: documents) handed over by TKS to the customer pass to the customer only by express agreement. The documents may be made accessible to third parties only with the prior consent of TKS and must be returned to TKS without delay upon request if a contract with TKS is not concluded or the contract ends through performance or in another way (e.g. termination, withdrawal). Sentences 1 and 2 apply accordingly to documents of the customer; however, these may be made accessible to third parties to whom TKS has permissibly transferred deliveries and, if they were sent before conclusion of the contract and no contract was concluded, may be destroyed three months after submission of the offer unless the customer has previously requested their return.

12.2 Clause 12.1 sentences 1 and 2 apply accordingly to samples, models, moulds, tools and special devices that TKS produces in the course of performing the contract.

13. Other claims for damages

13.1 Unless otherwise regulated in these General Terms of Delivery, claims for damages by the customer, irrespective of the legal grounds, in particular for breach of obligations arising from the contractual relationship and in tort, are excluded.

13.2 This does not apply insofar as liability exists

  • a)under the German Product Liability Act,
  • b)in the case of intent,
  • c)in the case of gross negligence,
  • d)in the case of fraudulent intent,
  • e)in the case of non-compliance with a guarantee given,
  • f)for injury to life, body or health, or
  • g)for breach of obligations whose fulfilment makes the proper performance of the contract possible in the first place and on whose fulfilment the customer may rely according to the purpose and content of the contract (material contractual obligations).

However, the claim for damages for breach of material contractual obligations is limited to the foreseeable damage typical for the contract, unless another of the aforementioned cases applies at the same time.

13.3 The above provisions do not entail a change in the burden of proof to the detriment of the customer.

14. Assignment and pledging

The assignment or contractual pledging of claims of the customer against TKS is permissible only with the consent of TKS.

15. Data protection

Information on data protection and on the processing of personal data by TKS is available at the internet address /datenschutz/.

16. Jurisdiction and applicable law

16.1 If the customer is a merchant, a legal entity under public law or a special fund under public law, the sole place of jurisdiction for all disputes arising directly or indirectly from the contractual relationship is the registered office of TKS. However, TKS is also entitled to bring an action at the customer’s registered office. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

16.2 This contract, including its interpretation, is governed by the law of the Federal Republic of Germany, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

17. Severability clause

Should one of the provisions of these terms of delivery or of the other parts of the contract be invalid, or should the contract, including these terms of delivery, contain a gap in its entirety, the validity of the remaining contractual provisions is not affected. Insofar as the invalidity of the contractual provision is not due to statutory provisions serving to protect a contracting party, the invalid provision is replaced by a valid one and a missing one is inserted in such a way that the intention of the contracting parties expressed in the contract and the purpose of the contract are met as far as possible.

General contract terms for construction work by TKS

General contract terms for the performance of construction work
by TKS Tele­kommu­nikations­bau Services GmbH

Version: January 2020

1. Scope of these General Contract Terms

These General Contract Terms for the Performance of Construction Work by TKS Tele­kommu­nikations­bau Services GmbH (hereinafter: AVB) apply exclusively to construction contracts between TKS Tele­kommu­nikations­bau Services GmbH (hereinafter: TKS) and the customer not acting as a consumer of services of TKS. General terms and conditions of the customer apply only insofar as TKS has expressly agreed to them in writing. § 305b BGB remains unaffected.

2. Conclusion of the contract and components of the contract

2.1 The offers of TKS are subject to change and non-binding. This also applies if catalogues, technical documentation, drawings, plans, calculations, cost estimates, references to DIN standards or other product descriptions or documents – including in electronic form – are made available to the customer.

2.2 The customer’s order for the deliveries is deemed a binding contractual offer. Unless the order expressly states otherwise, TKS may accept this contractual offer within three weeks of receipt.

2.3 In addition and subordinate to these AVB, the German General Contract Terms for the Execution of Construction Work (VOB/B) in the version published at the time the contract is concluded apply.

3. Services of TKS

3.1 TKS owes exclusively the expressly described services, including the necessary ancillary services within the meaning of VOB/C.

3.2 Duties to maintain safety of the customer or its clients do not pass to TKS.

4. Changes to the services

4.1 The customer’s right to request and order changes to the services, including additional services, is governed exclusively by § 650b BGB, with the proviso that orders under § 650b (2) BGB require written form.

4.2 If the customer orders a change to the services and has not made a deviating agreement with TKS, the claim to remuneration of TKS for the services omitted and added changes in accordance with the following provisions:

  • a)If omitted or added partial services are described and priced in the components of the contract (in particular a bill of quantities or a list of unit prices), the remuneration is reduced or increased by the prices shown there.
  • b)Otherwise, the remuneration is adjusted in accordance with § 650c BGB, whereby for increased or reduced personnel expenditure the agreed hourly rates per unit of time are deemed to be the actual costs including the surcharges for general business costs, risk and profit, and for other expenditure a surcharge for general business costs, risk and profit of 40 per cent on the actually required costs is deemed appropriate.
  • c)Claims of TKS under § 6 VOB/B and § 642 BGB remain unaffected by the above provisions.

§ 2 (5) and (6) VOB/B do not apply. Insofar as other provisions of the VOB/B refer to § 2 (5) or (6) VOB/B, the above provisions of clause 4.2 apply accordingly.

4.3 The customer is obliged to submit requests for changes in such good time that the negotiation phase under § 650b (1) BGB does not lead to any disruption of the construction process.

5. Use of subcontractors

TKS is entitled to have the services assigned to it performed by subcontractors. The customer may object to the use of a subcontractor if the performance of the services by this subcontractor is unreasonable for it and the subcontractor is not an affiliated company of TKS within the meaning of § 15 AktG.

6. Acceptance

6.1 A formal acceptance need only be carried out if it was agreed at the conclusion of the contract that the services would be formally accepted.

6.2 § 640 (2) sentence 1 BGB applies with the proviso that acceptance must be refused by stating at least one material defect or several defects which are material in their entirety.

7. Deadlines

If the conditions of § 642 BGB and § 6 (6) sentence 2 VOB/B are met, the compensation also covers the additional costs caused by the customer’s default of acceptance arising from increased or additional wage, equipment and material costs incurred after the end of the default of acceptance.

8. Remuneration, payments, set-off and rights of retention

8.1 The agreed remuneration is exclusive of the applicable statutory VAT, unless the customer is liable for VAT within the meaning of the UStG.

8.2 If the customer, as recipient of construction services, is liable for VAT, it will hand over to TKS without delay after conclusion of the contract and thereafter after expiry of the period of validity a valid certificate from the tax office responsible for it in accordance with § 13b (5) sentence 2 half-sentence 2 UStG.

8.3 If a cash discount is agreed for payment within a certain discount period, this period is only observed if the justified invoice amount has been received by TKS in full within the agreed discount period.

8.4 The customer is not entitled to the final payment defence; § 16 (3) nos. 2 to 6 VOB/B do not apply.

8.5 The customer is entitled to rights of set-off or retention only if its counterclaims have been finally established by a court or are undisputed or if its counterclaims are based on the same contractual relationship. TKS is entitled to avert the exercise of a right of retention by providing security – also by way of a guarantee.

9. Rights in respect of defects

9.1 If the contract is a commercial transaction, the obligation to inspect and give notice of defects under § 377 HGB applies accordingly.

9.2 There is no material defect in the case of only insignificant impairment of the suitability for the use presupposed under the contract or for customary use, unless a material defect already exists for other reasons.

9.3 Claims of the customer for damages due to a defect exist only in the cases regulated in clause 12.2. This provision does not involve any change in the burden of proof to the detriment of the customer.

10. Industrial property rights and copyrights

10.1 Unless otherwise agreed, TKS is obliged to provide the services free of industrial property rights and copyrights of third parties (hereinafter: property rights) only in the country of the construction project. If a third party asserts justified claims against the customer for infringement of property rights by services rendered by TKS and used in accordance with the contract, TKS is liable to the customer as follows:

  • d)TKS will, at its option and at its expense, either obtain a right of use for the services concerned, modify them so that the property right is not infringed, or replace them.
  • e)The obligation of TKS to pay damages is governed by clause 12.

10.2 The customer is obliged to notify TKS in writing without delay of the claims asserted by the third party, not to acknowledge an infringement or the existence of claims, and to defend against these claims only in agreement with TKS. If the customer stops using the delivery to mitigate damage or for other important reasons, it is obliged to point out to the third party that the cessation of use does not constitute an acknowledgement of an infringement of property rights.

10.3 Claims of the customer are excluded insofar as it is responsible for the infringement of property rights.

10.4 Claims of the customer are further excluded insofar as the infringement of property rights is caused by special specifications of the customer, by a use not foreseeable by TKS or by the service being modified by the customer.

10.5 Insofar as an existing infringement of property rights at the same time constitutes a material defect or defect of title, the provisions of clauses 9.1 to 9.3 apply accordingly in addition to the above provisions.

10.6 If TKS has to deliver in accordance with plans, specifications, drawings, models, samples or using materials provided by the customer, the customer is liable for ensuring that third-party property rights are not infringed as a result. TKS will inform the customer of property rights known to TKS. The customer indemnifies TKS against all third-party claims and compensates for the damage incurred. If TKS is prohibited by a third party from manufacturing or delivering on the basis of a property right belonging to that third party, TKS is entitled, without examining the legal situation, to stop the work, unless the alleged property rights obviously do not conflict with the manufacture or delivery.

10.7 The property rights to the models, moulds and devices, plans, designs and drawings created by TKS or by a third party on behalf of TKS belong to TKS, even if the customer has borne the costs for them.

11. Rights to documents

11.1 Ownership rights and copyrights to cost estimates, plans, drawings, calculations and other documents (hereinafter: documents) handed over by TKS to the customer pass to the customer only by express agreement. The documents may be made accessible to third parties only with the prior consent of TKS and must be returned to TKS without delay upon request if a contract with TKS is not concluded or the contract ends through performance or in another way (e.g. termination, withdrawal). Sentences 1 and 2 apply accordingly to documents of the customer; however, these may be made accessible to third parties to whom TKS has permissibly transferred services and, if they were sent before conclusion of the contract and no contract was concluded, may be destroyed three months after submission of the offer unless the customer has previously requested their return.

11.2 Clause 11.1 sentences 1 and 2 apply accordingly to samples, models, moulds, tools and special devices that TKS produces in the course of performing the contract.

12. Other claims for damages

12.1 Unless otherwise provided in these AVB, claims of the customer for damages, irrespective of the legal grounds, in particular due to breach of obligations arising from the contractual relationship and from tort, are excluded.

12.2 This does not apply insofar as liability arises

  • a)under the German Product Liability Act,
  • b)in the case of intent,
  • c)in the case of gross negligence,
  • d)in the case of fraudulent intent,
  • e)in the case of non-compliance with a guarantee given,
  • f)for injury to life, body or health, or
  • g)for breach of obligations whose fulfilment makes the proper performance of the contract possible in the first place and on whose fulfilment the customer may rely according to the purpose and content of the contract (material contractual obligations).

However, the claim for damages for breach of material contractual obligations is limited to the foreseeable damage typical for the contract, unless another of the aforementioned cases applies at the same time.

Furthermore, TKS is liable for damage caused to the customer by delay resulting from a contractual penalty forfeited by the customer towards its client only if the customer informs TKS of the contractual penalty agreed with its client before conclusion of the contract or – if the customer concludes the contract with its client only after conclusion of the contract with TKS – without delay after conclusion of the contract with its client, or if TKS was aware of the contractual penalty agreement between the customer and its client at the time the contract was concluded, or if TKS caused the delays intentionally.

12.3 The above provisions do not involve any change in the burden of proof to the detriment of the customer.

13. Assignment and pledging

The assignment or contractual pledging of claims of the customer against TKS is permissible only with the consent of TKS. If an assignment made nevertheless is effective in accordance with § 354a HGB, TKS may make payment to the customer with discharging effect.

14. Data protection

Information on data protection and on the processing of personal data by TKS is available at the internet address https://www.tks-dretzel.de/datenschutz/.

15. Formal requirements of the VOB/B

TKS may also effectively submit notices of concerns under § 8 (3) VOB/B and notices of obstruction under § 6 (1) VOB/B in text form.

16. Jurisdiction and applicable law

16.1 If the customer is a merchant, a legal entity under public law or a special fund under public law, the sole place of jurisdiction for all disputes arising directly or indirectly from the contractual relationship is the registered office of TKS. However, TKS is also entitled to bring an action at the customer’s registered office. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

16.2 This contract, including its interpretation, is governed by the law of the Federal Republic of Germany, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

17. Severability clause

Should any provision of these AVB or of the other components of the contract be invalid, or should the contract including these AVB contain a gap in its entirety, the validity of the remaining contractual provisions shall not be affected thereby. Unless the invalidity of the contractual provision is due to statutory provisions serving the protection of a contracting party, the invalid provision shall be replaced by a valid one and a missing one inserted in such a way as to correspond as closely as possible to the intention of the contracting parties expressed in the contract and to the purpose of the contract.

 

General contract terms for construction work for TKS

General contract terms for the performance of construction work
for TKS Tele­kommu­nikations­bau Services GmbH

Version: January 2020

1. Scope of these General Contract Terms

1.1 Construction contracts between TKS Tele­kommu­nikations­bau Services GmbH (hereinafter: TKS) as client and the contractor not acting as a consumer are governed, in addition to the other documents agreed as components of the contract, by these General Contract Terms for the Performance of Construction Work for TKS Tele­kommu­nikations­bau Services GmbH (hereinafter: AVB-Bau) and, subordinate to these AVB-Bau, by the German General Contract Terms for the Execution of Construction Work (VOB/B) in the version published at the time the contract is concluded.

1.2 Conflicting or additional terms of the contractor to which TKS has not expressly agreed in writing do not apply. TKS expressly objects to the application of such terms of the contractor that have not been expressly agreed, also for the future. § 305b BGB remains unaffected.

2. Scope of the contractor’s services

2.1 Insofar as the services to be performed are described functionally, the contractor owes, for the agreed remuneration, all partial services required to achieve the functionally described result.

2.2 Insofar as the services to be performed are described in detail, the contractor owes, for the agreed remuneration, all ancillary services within the meaning of VOB/C. The contractor owes special services within the meaning of VOB/C that are not expressly described, for the agreed remuneration, insofar as they are necessary in order to perform the expressly described services free of defects.

2.3 The contractor is obliged to inform TKS without delay of any recognised (including obvious) errors, typing and calculation errors in the documents, drawings and plans submitted by TKS. This also applies to missing documents or drawings.

2.4 If the contractor has not offered any equivalent products to the products proposed in the contract documents, the products proposed in the contract documents are deemed to be contractually owed. The addition “or equivalent” that may be listed in the specification of services or other documents is then deemed to be deleted and does not become part of the contract. If several products are proposed in the contract documents prepared by TKS, the contractor selects the product to be used at its reasonable discretion. If several products are proposed in the contract documents prepared by the contractor, TKS selects the product to be used at its reasonable discretion.

If the contractor has offered an alternative product, the contractor must provide proof of equivalence, in particular with regard to performance characteristics, appearance, function, building physics, operating costs, maintenance and the comprehensive suitability of this product for fulfilling the contractually owed requirements. The contractor must provide the proof of equivalence without being requested to do so and without delay after conclusion of the contract by submitting meaningful, comprehensive documents – at the request of TKS also by submitting samples. If the contractor cannot provide the proof of equivalence, paragraph 1 applies.

2.5 Insofar as non-harmonised construction products are to be supplied or processed and nothing to the contrary has been expressly agreed, the construction products supplied or to be processed must meet the requirements of the applicable Model Administrative Regulation on Technical Building Rules of the DIBt; the manufacturer’s declarations, certificates or test certificates required thereunder must be handed over to TKS at the latest upon delivery or before processing. Insofar as harmonised construction products are to be supplied or processed, the contractor may only use products bearing a CE marking; the contractor must hand over the corresponding declarations of performance for the products to TKS at the latest upon delivery or before processing.

3. Changes to the services

3.1 The ordering of changes to the services (including changes to the agreed result of the work) and their effect on the claim to remuneration are governed by §§ 650b et seq. BGB. § 1 (3) and (4) VOB/B and § 2 (5) and (6) VOB/B do not apply. Insofar as other provisions of VOB/B refer to § 2 (5) or (6) VOB/B, § 650c BGB and the following provisions apply accordingly. The right to order changes also includes the right to order changes to the construction circumstances, the construction time or the execution periods, unless these are unreasonable for the contractor.

3.2 The right to order changes and the obligation of the contractor under § 650b (2) BGB do not require that TKS has previously requested the change or that the contracting parties have previously attempted to reach agreement on the change and its effects on the remuneration.

3.3 If the contractor considers the execution of a change to the agreed result of the work to be unreasonable, it will notify TKS of this, stating the reasons, without delay after receipt of the request for change or – if there was no prior request for change – of the order for change.

3.4 If TKS requests a change or orders a change without a prior request for change, the contractor will submit a supplementary offer in accordance with § 650b (1) sentence 2 BGB without delay after receipt of the order or the request

3.5 The reduction or increase in remuneration is to be determined on the basis of the prices agreed in the bill of quantities or a list of unit prices, insofar as the services omitted or added as a result of the change are described in the bill of quantities or the list of unit prices, and otherwise in accordance with § 650c BGB. Discounts granted in the main contract also apply to the remuneration determined in accordance with sentence 1.

3.6 A change to the services owed by way of plans or other documents handed over by TKS or by third parties commissioned by TKS does not constitute an order. In this case, the contractor is obliged to notify the change in services and the resulting additional costs and any effects on deadlines in text form without delay and to obtain a corresponding order or to propose an amendment to the contract. If it fails to do so, its claims are governed by § 2 (8) VOB/B.

4. Execution and execution documents

4.1 The contractor must check the documents handed over to it completely and in detail immediately upon receipt and, as far as possible, take all measurements on site and compare them with the information in the documents. The contractor must notify any discrepancies (such as planning errors, gaps, contradictions, ambiguities, violations of the generally accepted rules of technology, dimensional deviations, etc.) as well as any concerns about the intended method of execution or the prescribed building materials in text form before the work begins.

4.2 The planning documents prepared by the contractor must be submitted to TKS for review and approval in good time before execution begins. TKS has a reasonable period, but at least 2 weeks, for reviewing and approving the execution documents. When sending the planning documents, the contractor must expressly state the latest date by which it needs approval of the plans so that there is no delay in the execution of the construction work.

4.3 Only documents approved by TKS for execution may be used as the basis for execution.

4.4 The approval of planning documents by TKS does not constitute an acknowledgement that a change in services is necessary, nor a contractual change in services. If the contractor recognises changes in services in planning documents to be approved, it must expressly point this out to TKS.

4.5 The contractor must return documents provided to it by TKS once the limitation period for claims for defects in respect of the services concerned by the documents has expired. It may allow third parties to inspect these documents only with the prior consent of TKS.

4.6 The contractor is obliged to continuously clear the construction site of waste, packaging material, rubble and other dirt caused by its services. After completion, it must leave all rooms and areas in broom-clean condition.

4.7 At the request of TKS, the contractor must keep daily construction reports and hand them over to TKS at the end of each week. They must contain all information that may be of importance for the execution and invoicing of the order. Depending on the type of service, this may include in particular: weather (in particular temperatures, precipitation); services performed; number, type and qualification of the workers employed on the construction site; working hours; number and type of large equipment used and its arrival and departure; delivery of main building materials; type, scope and location of the work performed with the essential information on construction progress (start and end of services of larger AVB-Bau-AG (TKS)Stand: 1/20202 | 5 scope); work stoppages stating the reasons; accidents and other important occurrences.

5. Evidence for the prevention of undeclared work and compliance with labour and social security law

5.1 The contractor must submit the following documents to TKS without delay after conclusion of the contract at the latest:

  • a)if the contractor is to perform crafts subject to licensing in accordance with Annex A to the German Crafts Code: proof of entry in the register of craftsmen or, if the contractor only has establishments in other EU or EEA states, proof of notification to the competent chamber of crafts,
  • b)an extract from the central trade register or comparable official proof from its home state, in each case not older than 3 months.

5.2 Before workers are deployed on the construction site for the first time, the contractor must submit to TKS:

  • a)proof of prequalification in accordance with § 6b (1) VOB/A, § 28e (3b) SGB IV
    or
    qualified certificates of good standing from the statutory accident insurance institutions responsible for the contractor or the temporary employment agencies it has commissioned (§ 150 (3) SGB VII), certificates of good standing from the collecting agencies responsible for the contractor or the temporary employment agencies it has commissioned for the total social security contributions (§ 28e (3f) SGB IV) and a qualified certificate of good standing from the social funds responsible for the contractor or the temporary employment agencies it has commissioned, stating the gross wage totals,
  • b)the registrations under § 16 MiLoG, § 18 AEntG and § 17b AÜG, insofar as the registration obligations under § 16 MiLoG, § 18 AEntG or § 17b AÜG exist,
  • c)A1 posting certificates for each worker to be deployed, insofar as employees of an employer based abroad are deployed.

If, after handing over these documents, the contractor deploys additional workers who are not covered by the scope of validity of the documents previously handed over, it must submit the documents relating to the additional workers before they are deployed.

5.3 Without delay after the end of each calendar month in which the contractor has deployed workers on the construction site, the contractor must submit to TKS its records of the start, end and duration of the daily working time of the employees in accordance with § 17 (1) MiLoG, § 19 (1) AentG or the Minimum Wage Documentation Ordinance (MiLoAufzV).

5.4 The evidence referred to in clauses 5.1 and 5.2 must be resubmitted in its current version, without being asked, as soon as and insofar as the period of validity of the documents previously submitted expires.

5.5 If this evidence is not submitted or is incomplete, TKS is entitled to withhold payments in an appropriate amount.

5.6 At the request of TKS, the contractor is obliged to authorise TKS in writing to obtain information on the payment of the total social security contributions from the competent collection agencies for the total social security contribution for the individual social security institutions or from the individual competent social security institutions, as well as information on the payment of the statutory accident insurance contributions from the competent employers’ liability insurance associations.

6. Deployment of employees, liability of the contractor for recourse liability, etc.

6.1 With regard to the workers deployed by the contractor on the construction site, the contractor is obliged towards TKS to comply with the applicable legal provisions on the remuneration of its workers, the granting of working conditions and the fulfilment of obligations under accident and social security law. The contractor indemnifies TKS against all claims justifiably asserted against TKS by an employee deployed by the contractor or one of its subcontractors or by a social security institution or a social fund due to the breach of the obligations mentioned in sentence 1, e.g. under § 14 AEntG, § 13 MiLoG, § 98a AufenthG, § 28e SGB IV or § 150 (3) SGB VII, and compensates TKS for all damage incurred by TKS as a result of the claim.

6.2 If the contractor or a subcontractor commissioned by it deploys foreign nationals for the performance of the services owed by the contractor whose employment requires a permit under § 4 (3) AufenthG or § 284 (1) SGB III, it must give TKS the names of these employees and submit the required permit before they are deployed.

6.3 If a fine is imposed on TKS or one of its representatives due to the unlawful employment of foreign workers by the contractor or a subcontractor of the contractor, the contractor will reimburse TKS or its representative for the fine. Further claims for damages of TKS remain unaffected.

6.4 The contractor must ensure that all persons working on the construction site on its behalf and on behalf of its subcontractors or temporary employment agencies carry identity cards/passports and social security cards with them at all times. TKS is entitled to carry out corresponding checks. TKS may expel persons who do not carry these documents from the construction site with immediate effect.

6.5 The contractor hands over to TKS weekly a list of all workers deployed by the contractor or its subcontractors.

6.6 The contractor is responsible for compliance with occupational health and safety. In doing so, it must comply with the provisions of a health and safety plan drawn up for the construction site, follow the instructions of a health and safety coordinator appointed for the construction site, make all necessary arrangements and take all necessary measures, and provide the necessary facilities. It is obliged to organise its operational processes in such a way that no hazards arise.

7. Deployment of subcontractors

7.1 The transfer of the performance obligations assumed by the contractor to subcontractors requires the prior written consent of TKS.

7.2 The contractor must ensure that the subcontractor does not award the services assigned to it to further subcontractors – not even in part – without the prior written consent of TKS.

7.3 The contractor must ensure, by means of corresponding contractual agreements with its subcontractors and temporary employment agencies, that it is able to fulfil its obligations towards TKS under clauses 5, 6, 15 and 17. The contractor provides TKS with proof of the conclusion of corresponding agreements with its subcontractors and temporary employment agencies upon request.

7.4 TKS is entitled to prohibit the deployment of workers of a subcontractor or temporary employment agency of the contractor on the construction site that is the subject of the contract with immediate effect if the contractor does not fulfil its obligations towards TKS under clauses 5 and/or 6 with regard to this subcontractor/temporary employment agency or its workers, or if the contractor, at the request of TKS, does not prove that it has ensured compliance with these obligations by means of agreements with the subcontractor or temporary employment agency. The prohibition may be revoked with effect for the future if the subcontractor or temporary employment agency undertakes to comply with these provisions and this is proven to TKS, and the subcontractor or temporary employment agency compensates for breaches of duty committed, e.g. in the case of non-payment of minimum wages or social security/social fund contributions by paying them subsequently to the entitled recipient.

7.5 TKS is entitled to prohibit the further deployment of a subcontractor with immediate effect if the contractor, at the request of TKS, does not prove that it has ensured compliance with the obligations under clauses 15 and 17 by means of agreements with the subcontractor. The prohibition may be revoked with effect for the future if the subcontractor undertakes to comply with these provisions and this is proven to TKS.

7.6 The contractor assigns all claims for defects against its subcontractors and suppliers to TKS by way of security. The contractor remains entitled to enforce and collect its claims for defects in its own name and is authorised to conduct proceedings in its own name on behalf of TKS (voluntary representative action) as long as and insofar as the contractor is entitled towards TKS to subsequent performance. Subject to the condition precedent that and to the extent that the contractor has satisfied the claims for defects of TKS, TKS reassigns the contractor’s claims for defects to the contractor.

The above applies accordingly to the contractor’s claims for performance against its subcontractors and suppliers.

8. Bearing of risk/liability

8.1 The bearing of risk is determined solely in accordance with § 644 BGB.

8.2 Unless otherwise provided in these AVB-Bau, claims of the contractor for damages, irrespective of the AVB-Bau-AG (TKS)Stand: 1/20203 | 5 legal grounds, in particular due to breach of obligations arising from the contractual relationship and from tort, are excluded.

8.3 The exclusion of liability under clause 8.2 does not apply insofar as liability exists

  • a)under the German Product Liability Act,
  • b)in the case of intent
  • c)in the case of gross negligence,
  • d)in the case of fraudulent intent,
  • e)in the case of non-compliance with a guarantee given,
  • f)for injury to life, body or health, or
  • g)for breach of obligations whose fulfilment makes the proper performance of the contract possible in the first place and on whose fulfilment the contractor may rely according to the purpose and content of the contract (material contractual obligations).

However, the claim for damages for breach of material contractual obligations is limited to the foreseeable damage typical for the contract, unless another of the aforementioned cases applies at the same time.

8.4 The above provisions do not entail a change in the burden of proof to the detriment of the contractor.

9. Securities

9.1 §§ 232 to 240 BGB apply to securities to be provided by the contractor, unless otherwise stipulated in the following provisions or in § 17 VOB/B.

9.2 Performance security

  • a)An agreed performance security must secure the timely and complete performance of the contract by the contractor. The purpose of this performance security covers the securing of all claims of TKS against the contractor arising from the contract, which include in particular claims for damages due to non-performance or defective performance and claims due to services not performed on schedule (for example any agreed contractual penalty or claims for damages due to delay), but claims for defects only in respect of defects notified no later than three weeks after acceptance. The purpose of the security also covers claims for repayment of overpayments.
  • b)The performance security must be provided without delay after conclusion of the contract.
  • c)If the contract sum increases after conclusion of the contract due to changes in the scope of services, the contractor must adjust the security to the changed contract sum at the request of TKS. If the contract sum decreases, TKS must return a corresponding part of the security at the request of the contractor. In both cases, a request for adjustment is only permissible if the security is to be increased or returned by at least five per cent.
  • d)A performance security that has not been realised must be returned three weeks after the service has been accepted or TKS has defaulted on acceptance. In the case of partial acceptances, sentence 1 applies with the proviso that the security must be returned proportionately, so that TKS retains a security whose amount in relation to the partial services not yet performed corresponds to the contractually agreed ratio of the amount of the performance security to the contractual value of the overall service. The return may be refused as long as an agreed and due security for defects has not been provided or insofar as justifiably asserted claims covered by the purpose of the security have not yet been satisfied, whereby claims relating to partial services not yet due and not yet performed are disregarded in the case of return after a partial acceptance.

9.3 Security for claims for defects

  • a)An agreed security for defects must secure the timely and complete satisfaction of claims for defects of TKS by the contractor. If a performance security has also been agreed, the security for defects only secures claims in respect of defects that are notified for the first time later than three weeks after acceptance.
  • b)The security for claims for defects must be provided without delay after acceptance. In the case of partial acceptances, the security must be provided in an amount which, in relation to the contractual value of the partial services not yet accepted, corresponds to the contractually agreed ratio of the amount of the security for claims for defects to the contractual value of the total work.
  • c)A security for defects that has not been realised must be returned when the agreed limitation period for rights in respect of defects (hereinafter: period) has expired. If different periods apply to the secured claims, the security must be returned proportionately after expiry of each period, so that TKS retains a security whose amount in relation to the contractual value of the parts of the service whose periods have not yet expired corresponds to the contractually agreed ratio of the amount of the security for defects to the contractual value of the overall service. Insofar as justifiably asserted claims covered by the purpose of the security have not yet been satisfied and are not time-barred, TKS may retain a corresponding part of the security.

9.4 Types of security

  • a)The contractor may provide the securities at its option by guarantee, by payment into a blocked account at a financial institution to be chosen by the contractor, over which TKS and the contractor can only dispose jointly, or by deposit in a lawyer’s or notary’s escrow account. The contractor bears the costs of the security. Any interest is due to the contractor. The contractor may replace one security with another.
  • b)If the contractor provides the security by guarantee, the guarantee must be issued by a suitable guarantor (§ 239 BGB). The guarantee must expressly secure the claims to be secured as agreed, contain a waiver of the defence of prior action, contain a waiver of the defence of set-off with the exception of undisputed or legally established counterclaims, and must not be limited in time or conditional. A release of the guarantor by depositing the guaranteed amount must be excluded. The guarantee must contain the declaration that claims of TKS under the guarantee do not become time-barred before the secured claims of TKS become time-barred, but at the latest 30 years after the start of the statutory limitation period of the guarantee claim. The guarantee relationship must be subject to German law. The declaration of guarantee must be issued in writing or, if the guarantee is a commercial transaction for the guarantor, in text form. If a security provided by guarantee is to be partially returned, this may be done by a declaration of release by TKS.

9.5 If the contractor does not provide an agreed security in time, TKS may form the security by withholding due payments. If no payment claims required to reach the agreed amount of the security are due, TKS may set the contractor a reasonable deadline for providing security. After this deadline has expired without result, TKS may terminate the contract in analogous application of § 648a BGB.

10. Termination

10.1 In addition to the grounds for termination provided for in § 8 VOB/B and §§ 648, 648a BGB, TKS is entitled to terminate for good cause in particular if

  • a)the contractor offers, promises or grants advantages to persons who are involved on the part of TKS in the preparation, conclusion or execution of the contract, or to persons close to them; such acts of the contractor are equivalent to acts of persons authorised or commissioned by it or acting on its behalf; it is irrelevant whether such advantages were offered or promised directly to the persons or to a third party in their interest;
  • b)the contractor breaches its obligations under clause 6.1 sentence 1 or does not fulfil its obligations under clauses 5.1 to 5.4, 6.2, 6.4, 6.5 or 17.1;
  • c)the contractor has repeatedly been in default with contractual deadlines.

10.2 TKS may limit an ordinary or extraordinary termination to a separable part of the services. Separability is not precluded by the fact that services of the same kind as the terminated partial services are still to be performed in other spatial areas covered by the contract, as long as the terminated services have no actual points of contact with the services of the same kind still to be performed.

11. Acceptance

After completion of all of the contractor’s services, a formal acceptance takes place. Any partial acceptances must also be carried out formally within the meaning of § 12 (4) VOB/B. Deemed acceptance under § 12 (5) nos. 1 and 2 is excluded.

12. Invoices, payments

12.1 Invoices are issued exclusively electronically. The invoices must contain the information required under § 14 (4) UStG and the order numbers specified by TKS, be verifiable and contain the description of the services stating the construction project and AVB-Bau-AG (TKS)Stand: 1/20204 | 5 the proofs of performance countersigned by TKS as well as material certificates. If TKS is liable for VAT under VAT law, the following addition must be included on the invoices: “Steuerschuldnerschaft des Leistungsempfängers” (reverse charge).

12.2 Invoices for agreed partial services must bear a corresponding note; interim invoices must be designated as such. Payments on these partial or interim invoices do not constitute acceptance of these partial services.

12.3 TKS is entitled to deduct a cash discount of three per cent from every payment if TKS pays the justified invoice amount within 14 calendar days of the start of the payment period.

12.4 Payments are made by cheque or SEPA bank transfer. Discount and payment periods are observed and are met in time if the cheque is sent by post on the due date at the latest or the transfer has been instructed at the bank holding the account of TKS before the deadline expires.

12.5 TKS does not owe interest on maturity.

13. Prohibition of assignment/pledging, set-off, rights of retention

13.1 The assignment or contractual pledging of claims of the contractor arising from the contract is excluded. If an assignment made nevertheless is effective in accordance with § 354a HGB, TKS may make payment to the contractor with discharging effect.

13.2 The contractor is entitled to rights of set-off or retention only if its counterclaims have been established by a final court decision or are undisputed, or if its counterclaims are based on the same contractual relationship.

13.3 Should a dispute arise between the parties due to incomplete payment of instalment invoices and should the contractor wish to suspend the services or terminate the contract due to default of payment, TKS may avert the right to refuse performance and the right of termination by paying 75 per cent of the disputed amount. At the request of TKS, the contractor must secure this payment in full by handing over a guarantee that must meet the requirements of clause 9.4 (b).

13.4 The right of avoidance under clause 13.3 does not apply insofar as the disputed payment obligation has been established by a court, including provisionally by an interim injunction. There is no right to refuse performance or right of termination insofar as the disputed payment obligation has been denied by a court, including provisionally by an interim injunction. Nor is there a right to refuse performance or right of termination as long as summary court proceedings initiated by the contractor concerning the disputed payment are pending.

13.5 Insofar as the justification of the disputed payment claim is established by a provisional court decision after the payment has been made, TKS returns the corresponding part of the security provided in accordance with clause 13.3 sentence 2; insofar as it is denied, the contractor repays the payment received in accordance with clause 13.3 sentence 1 and then receives back the corresponding part of the security.

13.6 Insofar as the disputed payment obligation turns out to be justified after an agreement between the contracting parties or by a final and legally binding court decision, TKS reimburses the contractor for the costs of the guarantee in the amount of the usual costs of providing security up to a maximum rate of two per cent per year; insofar as it turns out to be unjustified, the contractor bears the costs of the guarantee itself and pays interest on the amount to be repaid at nine percentage points above the base rate per year from the date of payment.

14. Rights in the event of defects

14.1 Rights in the event of defects become time-barred within the statutory period plus two months. § 13 (4) no. 2 VOB/B does not apply.

14.2 § 13 (5) VOB/B applies with the proviso that the request of TKS under § 13 (5) (1) sentences 1 and 2 VOB/B may be made in text form.

14.3 In the event of defects, the contractor must also remedy, at its own expense, the consequential damage resulting from the remedying of defects and bear all expenses for restoring the condition that would have existed had the work been executed free of defects, in particular for removing and reinstalling its services.

14.4 The contractor must also consult and coordinate with TKS and, where applicable, other trades still working on the construction site when remedying defects. The defect remedy work must be formally accepted upon its completion.

14.5 Special circumstances within the meaning of §§ 281 (2), 323 (2) no. 3, 440 sentence 1, 636, 637 (2) sentence 1 BGB that make setting a deadline unnecessary exist in particular in urgent cases, e.g. if TKS itself would be in default towards its customer by waiting for a deadline to expire.

14.6 For faults in products of the contractor that are attributable to fault on the part of the contractor, the contractor indemnifies TKS against the resulting product liability to the extent that it would itself be directly liable.

14.7 Further or other statutory claims, in particular due to defects or product faults, remain unaffected.

15. Industrial property rights and copyrights

15.1 The contractor guarantees that no industrial property rights or copyrights of third parties conflict with the contractually agreed use of the services. It indemnifies TKS against all claims arising from the infringement of such property rights and must reimburse TKS for the necessary expenses incurred as a result of the claim.

15.2 Ownership rights and copyrights to the illustrations, plans, drawings, calculations, computations and other physical or digital documents (hereinafter: documents) provided to the contractor by TKS pass to the contractor only by express agreement. The documents must be kept confidential, used exclusively for the performance of the contractual services and returned without being requested after the service has been provided or the contract has otherwise ended.

15.3 TKS is entitled to use, reproduce and modify all planning and other services of the contractor as well as documents to be submitted by it comprehensively for the construction project that is the subject of the contract – also in the event of premature termination of the contract. The transfer of these rights of use is covered by the contractual remuneration.

16. Contractual penalty for default, damages for delay

16.1 If a contractual penalty has been agreed for default with the completion date, the contractor forfeits, for each calendar day of default with the completion date, a contractual penalty of 0.15 % of its total net remuneration claim (before allocations and reductions due to defects). The contractual penalty for exceeding the completion date is limited to 5 % of the total net remuneration claim (before allocations and reductions due to defects).

16.2 If a contractual penalty has been agreed for default with other contractual deadlines, the contractor forfeits, for each calendar day of default with an interim deadline subject to a contractual penalty, a contractual penalty of 0.15 % of the part of its net remuneration claim attributable to the services to be performed by the interim deadline (before allocations and reductions due to defects). The contractual penalty for exceeding an interim deadline is limited to 5 % of the part of the net remuneration claim attributable to the services to be performed by the interim deadline (before allocations and reductions due to defects). A contractual penalty forfeited for exceeding an interim deadline is offset against contractual penalties subsequently forfeited for exceeding interim deadlines or the completion date.

16.3 If the contracting parties agree new binding contractual deadlines after conclusion of the contract, the agreed contractual penalties also apply to these newly agreed deadlines. The same applies to postponements of deadlines in accordance with § 6 (2) and (4) VOB/B.

16.4 TKS may declare the reservation of the contractual penalty until the final payment claim becomes due, but at the latest until the final payment.

16.5 The damage to be compensated by the contractor in the event of default also includes lost profit – the restrictions of § 6 (6) VOB/B do not apply in this respect.

17. Data protection

17.1 Each contracting party is obliged towards the other contracting party to comply with the applicable statutory data protection provisions and not to collect, process or use personal data for purposes or to an extent other than those required under this contract.

17.2 Information on data protection and on the processing of personal data by TKS is available at the internet address https://www.tks-dretzel.de/datenschutz/.

18. Working days, business days

Business days within the meaning of the contract and its components are all days of the week except Sundays and public holidays at the location of the construction project. Working days are all business days except Saturdays.

19. Jurisdiction and applicable law

19.1 If the contractor is a merchant, a legal entity under public law or a special fund under public law, the exclusive place of jurisdiction for all disputes arising directly or indirectly from the contractual relationship is the registered office of TKS. However, TKS is also entitled to bring an action at the customer’s registered office. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

19.2 This contract, including its interpretation, is governed by the law of the Federal Republic of Germany, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

20. Severability clause

Should one of the provisions of these AVB-Bau or of the other parts of the contract be invalid, or should the contract, including these AVB-Bau, contain a gap in its entirety, the validity of the remaining contractual provisions is not affected. Insofar as the invalidity of the contractual provision is not due to statutory provisions serving to protect a contracting party, the invalid provision is replaced by a valid one and a missing one is inserted in such a way that the intention of the contracting parties expressed in the contract and the purpose of the contract are met as far as possible.

Terms and conditions of purchase

Purchasing conditions of TKS Tele­kommu­nikations­bau Services GmbH

Version: October 2019

Validity of the purchasing conditions

1.1 All (including future) enquiries, orders and agreements under which the main performance obligation of TKS consists of a payment obligation are based exclusively on the following conditions. In the case of construction contracts, the German General Contract Terms for the Execution of Construction Work (VOB/B) in the version published at the time the contract is concluded apply in addition and subordinate to these purchasing conditions.

1.2 These purchasing conditions apply exclusively. Conflicting or additional terms of the contractor to which TKS has not expressly agreed in writing do not apply. The acceptance of deliveries or services and payments do not constitute consent. TKS expressly objects to the application of such terms of the contractor that have not been expressly agreed, also for the future.

1.3 These terms and conditions of purchase do not apply to consumers or insofar as individually negotiated deviating agreements have been made.

2. Order, order confirmation

2.1 All agreements only become binding with the written order of TKS. Changes and additions to the order are only effective if they have been confirmed in writing by TKS.

2.2 The contractor is obliged to inform TKS without delay of any recognised (including obvious) errors, typing and calculation errors in the documents, drawings and plans submitted by TKS, so that the order of TKS can be corrected. This also applies to missing documents or drawings.

2.3 The contractor is obliged to treat the orders of TKS and all related commercial and technical details as trade secrets.

2.4 After receipt of the order, the contractor will send TKS without delay a confirmation of the delivery/service to be provided, stating the date of delivery or completion. Deviations from the order conditions are not accepted.

3. Scope of delivery/services

3.1 The contractor is obliged and warrants to fulfil the specifications laid down in enquiries and orders of TKS as well as its own statements that have become part of the contract, and to comply with all agreed or relevant standards and regulations (e.g. DIN/EN/ISO/VOB/C/VDE) and the generally accepted rules of technology when carrying out the deliveries and services.

3.2 Deliveries and services must comply with the laws, ordinances and regulations applicable at the time of performance or default of acceptance.

3.3 The contractor guarantees that no materials are used or installed in the deliveries/services that are harmful to the environment, particularly in the event of fire (quality guarantee).

3.4 For substances or mixtures to be supplied by the contractor for which a safety data sheet must be prepared under the REACH Regulation (Regulation (EC) 1907/2006) or the German Hazardous Substances Ordinance (GefStoffV), or for which the contractor has information obligations towards the buyer, the contractor must hand over the safety data sheets or safety information (in particular under § 5 GefStoffV and Art. 32 REACH Regulation) to us without delay after conclusion of the contract. Safety data sheets must also be handed over to us without being asked for the mixtures referred to in Art. 31 (3) REACH Regulation. In the event of changes within the meaning of Art. 31 (9) or Art. 32 (3) REACH Regulation, the contractor hands over updated safety data sheets or information sheets to us without delay and without being asked.

4. Changes to the services

4.1 The contractor must notify without delay any changes to the agreed services, including additional services, that become necessary during the performance of the contract. They require the prior written consent of TKS.

4.2 Insofar as the contractor owes under the contract the manufacture or modification of an item or another result to be achieved by work or service, TKS is entitled to order changes in analogous application of § 650b BGB, whereby the order for change does not have to be preceded by a request for change. The contractor’s payment claim is adjusted in accordance with § 650c (1) BGB, unless TKS reaches agreement with the contractor on the amount of the adjustment of the payment claim. The contractor will submit a supplementary offer to TKS without delay after the order for change.

5. Execution of deliveries/services

5.1 Insofar as non-harmonised construction products are to be supplied or processed and nothing to the contrary has been expressly agreed, the construction products supplied or to be processed must meet the requirements of the applicable Model Administrative Regulation on Technical Building Rules of the DIBt; the manufacturer’s declarations, certificates or test certificates required thereunder must be handed over to TKS at the latest upon delivery or before processing. Insofar as harmonised construction products are to be supplied or processed, the contractor may only use products bearing a CE marking; the contractor must hand over the corresponding declarations of performance for the products to TKS at the latest upon delivery or before processing.

5.2 Delivery is made delivered duty paid (DDP, Incoterms 2010).

5.3 The contractor must notify TKS of the dispatch in text form at the latest when the goods are handed over to the carrier. In the shipping documents, the contractor must state all order details corresponding to the specifications of the order (order number, order date, delivery point, etc.) as well as the content of the delivery and the date of dispatch. If this information is missing and delays or costs arise as a result, these shall be borne by the contractor.

5.4 TKS is entitled to return reusable packaging to the contractor against remuneration as shown in the invoice. However, there is no obligation to return the packaging.

5.5 In the event of discrepancies between the invoiced weight and the weight on receipt, the weight determined at the goods receipt notification shall apply, unless the contractor proves that the weight stated by it was correctly determined. This also applies analogously to quantities.

5.6 Confirmations of receipt and the countersigning of proofs of performance do not constitute acceptance of the services described therein.

5.7 Material provided remains the property of TKS. It must be stored separately as such, marked as the property of TKS and may only be used for orders of TKS. The contractor is liable for any reduction in value or loss even without fault.

6. Subcontractors, deployment of employees

6.1 The transfer of the performance obligations assumed by the contractor to subcontractors requires the prior written consent of TKS.

6.2 If the contractor or a subcontractor commissioned by it deploys foreign nationals for the performance of services or work owed by the contractor whose employment requires a permit under § 4 (3) AufenthG or § 284 (1) SGB III, it must give TKS the names of these employees and submit the required permit before they are deployed.

6.3 Insofar as the contractor owes the performance of services or work, it undertakes towards TKS, with regard to the employees deployed for this purpose, to comply with the applicable legal provisions on the remuneration of its workers, the granting of working conditions and the fulfilment of obligations under accident and social security law. In the event of the transfer of services under this contract or the hiring of temporary workers, the contractor will expressly oblige its subcontractors and temporary employment agencies to comply with these obligations and to pass them on in identical terms. The contractor indemnifies TKS against all claims justifiably asserted against TKS by an employee deployed by the contractor or one of its subcontractors or by a social security institution due to the breach of the obligations mentioned in sentence 1, e.g. under § 14 AEntG, § 13 MiLoG, § 98a AufenthG, § 28e SGB IV or § 150 (3) SGB VII, and compensates TKS for all damage incurred by TKS as a result of the claim.

6.4 If the contractor breaches an obligation under clause 4.1 or 4.2 or 4.3 sentence 1 of these terms and conditions of purchase, we have the right to withdraw from the contract or to terminate the contract extraordinarily without notice; claims for damages remain unaffected.

7. Performance/delivery dates, default of acceptance

7.1 The timeliness of deliveries is determined by receipt at the receiving point specified by TKS. In the case of deliveries with installation and/or assembly and in the case of work services, completion ready for acceptance is decisive.

7.2 Deliveries before the agreed delivery date may be rejected by TKS.

7.3 The contractor is obliged to inform TKS of delays in text form without delay as soon as they become known.

7.4 In the event of default in delivery by the contractor, the contractor owes TKS lump-sum damages in the amount of 0.2 % of the contractual value of the services affected by the default per working day, but no more than 5 % of the contractual value; both contracting parties reserve the right to prove higher or lower damage. In addition, after expiry of a reasonable deadline set for subsequent performance, TKS is entitled to have the service not yet performed by the contractor performed by a third party at the contractor’s expense. Further statutory or agreed rights remain unaffected.

7.5 The statutory provisions apply to the occurrence of default of acceptance by TKS. However, the contractor must offer its performance to TKS in accordance with §§ 294, 295 BGB, in particular request TKS to perform the necessary act, also if an act is required to effect performance for which a calendar date is set, or which must be preceded by an event and for which a reasonable time is set in such a way that it can be calculated by the calendar from the event.

8. Prices

8.1 If the contractor also owes assembly and subsequent services (e.g. commissioning, trial operation), the agreed prices also include all related costs (e.g. intermediate transport, storage, deployment of workers and equipment, etc.).

8.2 If TKS has to bear the freight by express agreement, the contractor must choose the type of transport prescribed by TKS, otherwise the type of transport and delivery most favourable for TKS.

8.3 If, by express agreement, packaging is not included in the price, the packaging must be charged at cost price. The contractor must choose the packaging specified by TKS and ensure that the packaging protects the goods from damage.

9. Terms of payment

9.1 Payment claims fall due at the earliest after delivery or completion and acceptance of the respective service. Statutory or agreed rights to interim payments remain unaffected.

9.2 Invoices are issued exclusively electronically. TKS agrees to receive electronic invoices. The invoices must contain the information required under § 14 (4) UStG and the order numbers specified by TKS, be verifiable and contain the description of the deliveries and/or services, in the latter case stating the property concerned, and the proofs of performance countersigned by TKS as well as material certificates. If TKS is liable for VAT under VAT law, the following addition must be added to invoices: “Steuerschuldnerschaft des Leistungsempfängers” (reverse charge).

9.3 Invoices for agreed partial services must bear a corresponding note; interim invoices must be designated as such. Payments on these partial or interim invoices do not constitute acceptance of these partial services.

9.4 For steel deliveries, payment is made on the 15th of the second month following delivery and receipt of the invoice; otherwise within 30 days net or less 3% cash discount within 10 days of receipt of the invoice and delivery and/or completion and acceptance of the service; for invoices for construction work, also less 0.3 % of the invoice amount for construction all-risk insurance, insofar as TKS has taken out such insurance that also covers the services of the contractor.

9.5 If the invoices are not verifiable in whole or in part or do not comply with the contractual agreements, TKS is entitled to withhold the corresponding invoice amounts. TKS will ask the contractor to comment without delay. Once the matter has been clarified, TKS will pay the withheld amounts, insofar as they have been justifiably claimed by the contractor, within the payment periods specified in clause 9.3. If the contractor is responsible for the delay caused by such checks, among other things due to missing or incomplete information and/or documents, the payment periods are interrupted for the period of the delay.

9.6 Payments do not constitute acknowledgement of the deliveries or services as complete or in conformity with the contract.

9.7 Payments are made by SEPA bank transfer. Discount and payment periods are observed if the transfer has been instructed at the bank holding the account of TKS on the due date.

9.8 TKS does not owe interest on maturity.

9.10 TKS is only in default if TKS does not pay after a reminder from the contractor issued after the price has become due. The annual default interest in the event of default of payment is 5 percentage points above the base rate.

10. Prohibition of assignment/pledging, set-off, rights of retention

10.1 The assignment or contractual pledging of claims of the contractor arising from the contract is excluded. If an assignment made nevertheless is effective in accordance with § 354a HGB, TKS may make payment to the contractor with discharging effect.

10.2 The contractor is entitled to rights of set-off or retention only if its counterclaims have been finally established by a court or are undisputed or if its counterclaims are based on the same contractual relationship. TKS is entitled to avert the exercise of a right of retention by providing security – also by way of a guarantee.

11. Obligation to inspect and give notice of defects

11.1 Insofar as TKS is subject to obligations to inspect and give notice of defects under § 377 HGB, defects are in any case deemed to have been notified without delay if notified within the following periods:

  • in the case of obvious defects, if the notification reaches the contractor three working days after delivery;
  • in the case of defects that only become apparent during a proper inspection, if the notification reaches the contractor two weeks after delivery;
  • in the case of hidden defects, if the notification reaches the contractor two weeks after discovery of the defect.

11.2 In the case of agreed delivery to a third-party merchant, sentence 1 applies with the proviso that the periods for defects that are not hidden begin with delivery to the third party.

11.3 In the case of agreed delivery to a third party who is not a merchant, defects are in any case deemed to have been notified in time if the notice reaches the contractor two weeks after TKS has become aware of the defect.

12. Liability for defects

12.1 Contrary to § 442 (1) sentence 2 BGB, TKS is entitled to rights in respect of defects even if the defect remained unknown to TKS at the time the contract was concluded due to gross negligence.

12.2 For steel deliveries, the contractor warrants, irrespective of the state of processing, that only steels in accordance with DIN EN 1090 are supplied or used. The 3.1 certificates in accordance with DIN/EN 10204 must be submitted or handed over to TKS at the time of delivery of the goods.

12.3 Claims for defects become time-barred after 5 years plus 2 months.

12.4 Subsequent performance is carried out at the option of TKS by rectification or replacement delivery or new production. Insofar as the contractor owes the assumption of the costs for removal and reinstallation of the item in accordance with § 439 (3) BGB, it is obliged, at the request of TKS, to remove the defective item at its own expense and to reinstall it after subsequent performance.

12.5 Special circumstances within the meaning of §§ 281 (2), 323 (2) no. 3, 440 sentence 1, 636, 637 (2) sentence 1 BGB that make setting a deadline unnecessary exist in particular in urgent cases, e.g. if TKS itself would be in default towards its customer by waiting for a deadline to expire.

12.6 For faults in products of the contractor that are attributable to fault on the part of the contractor, the contractor indemnifies TKS against the resulting product liability to the extent that it would itself be directly liable.

12.7 Further or other statutory claims, in particular due to defects or product faults, remain unaffected.

13. Property rights, rights to documents

13.1 The contractor guarantees that no industrial property rights or copyrights of third parties conflict with the contractually agreed use of the deliveries/services. It indemnifies TKS and its customers against all claims arising from the infringement of such property rights and must reimburse TKS for the necessary expenses incurred as a result of the claim.

13.2 Ownership rights and copyrights to illustrations, plans, drawings, calculations, computations and other documents provided to the contractor by TKS do not pass to the contractor. The documents must be kept confidential, used exclusively for production on the basis of the order of TKS and returned without being requested after the service has been provided or the contract has otherwise ended.

14. Termination

TKS is entitled to terminate the contract for good cause with immediate effect. Good cause exists in particular if

  • the contractor stops making payments to its suppliers or subcontractors,
  • the contractor or, admissibly, a creditor applies for the opening of insolvency proceedings or comparable proceedings concerning the contractor’s assets, such proceedings are opened or their opening is rejected for lack of assets,
  • the contractor breaches contractual obligations several times or repeatedly.

Other statutory rights of termination and claims remain unaffected.

15. Securities

The following applies to contractually agreed securities:

15.1 §§ 232 to 240 BGB apply to the provision of security, unless otherwise stipulated in the following provisions.

15.2 Performance security

15.2.1 An agreed performance security must secure the timely and complete performance of the contract by the contractor. The purpose of this performance security covers the securing of all claims of TKS against the contractor arising from the contract, which include in particular claims for damages due to non-performance or defective performance and claims due to services not performed on schedule (for example any agreed contractual penalty or claims for damages due to delay), but claims for defects only in respect of defects notified no later than three weeks after acceptance. The purpose of the security also covers claims for repayment of overpayments.

15.2.2 The performance security must be provided without delay after conclusion of the contract.

15.2.3 If the contract sum increases after conclusion of the contract due to changes in the scope of services, the contractor must adjust the security to the changed contract sum at the request of TKS. If the contract sum decreases, TKS must return a corresponding part of the security at the request of the contractor. In both cases, a request for adjustment is only permissible if the security is to be increased or returned by at least five per cent.

15.2.4 A performance security that has not been realised must be returned three weeks after the service has been accepted or TKS has defaulted on acceptance. In the case of agreed or accepted partial services, sentence 1 applies with the proviso that the security must be returned proportionately, so that TKS retains a security whose amount in relation to the partial services not yet performed corresponds to the contractually agreed ratio of the amount of the performance security to the contractual value of the overall service. The return may be refused as long as an agreed and due security for defects has not been provided or insofar as justifiably asserted claims covered by the purpose of the security have not yet been satisfied, whereby claims relating to partial services not yet due and not yet performed are disregarded in the case of return after partial services have been performed.

15.3 Security for defects

15.3.1 An agreed security for defects must secure the timely and complete satisfaction of claims for defects of TKS by the contractor. If a performance security has also been agreed, the security for defects only secures claims in respect of defects that are notified for the first time later than three weeks after acceptance.

15.3.2 The security for claims for defects must be provided without delay after acceptance. In the case of acceptance of partial services, the security must be provided in an amount which, in relation to the contractual value of the partial services not yet accepted, corresponds to the contractually agreed ratio of the amount of the security for claims for defects to the contractual value of the total work.

15.3.3 A security for defects that has not been realised must be returned when the agreed limitation period for rights in respect of defects (hereinafter: period) has expired. If different periods apply to the secured claims, the security must be returned proportionately after expiry of each period, so that TKS retains a security whose amount in relation to the contractual value of the parts of the service whose periods have not yet expired corresponds to the contractually agreed ratio of the amount of the security for defects to the contractual value of the overall service. Insofar as justifiably asserted claims covered by the purpose of the security have not yet been satisfied and are not time-barred, TKS may retain a corresponding part of the security.

15.4 Types of security

15.4.1 The contractor may provide the securities at its option by guarantee, by payment into a blocked account at a financial institution to be chosen by the contractor, over which TKS and the contractor can only dispose jointly, or by deposit in a lawyer’s or notary’s escrow account. The contractor bears the costs of the security. Any interest is due to the contractor. The contractor may replace one security with another.

15.4.2 If the contractor provides the security by guarantee, the guarantee must be declared by a suitable guarantor (§ 239 BGB). The guarantee must expressly secure the claims to be secured as agreed, contain a waiver of the defence of prior action, contain a waiver of the defence of set-off with the exception of undisputed or legally established counterclaims, and must not be limited in time or conditional. A release of the guarantor by depositing the guaranteed amount must be excluded. The guarantee must contain the declaration that claims of TKS under the guarantee do not become time-barred before the secured claims of TKS become time-barred, but at the latest 30 years after the start of the statutory limitation period of the guarantee claim. The guarantee relationship must be subject to German law. The declaration of guarantee must be issued in writing or, if the guarantee is a commercial transaction for the guarantor, in text form. If a security provided by guarantee is to be partially returned, this may be done by a declaration of release by TKS.

15.5 If the contractor does not provide an agreed security in time, TKS may form the security by withholding due payments. If no payment claims required to reach the agreed amount of the security are due, TKS may set the contractor a reasonable deadline for providing security. After this deadline has expired without result, TKS may withdraw from or terminate the contract.

16. Place of jurisdiction and choice of law

16.1 If the contractor is a merchant, the place of jurisdiction is the registered office of our company. This jurisdiction agreement does not apply to summary proceedings for payment or insofar as an exclusive place of jurisdiction is established by law.

16.2 The law of the Federal Republic of Germany applies exclusively, excluding the UN Convention on Contracts for the International Sale of Goods (CISG).

17. Data protection

Information on data protection and on the processing of personal data by TKS is available at the internet address
/datenschutz/.

18. Severability clause

Should one of the provisions of these terms and conditions of purchase or of the other parts of the contract be invalid, or should the contract, including these terms and conditions of purchase, contain a gap in its entirety, the validity of the remaining contractual provisions is not affected. Insofar as the invalidity of the contractual provision is not due to statutory provisions serving to protect a contracting party, the invalid provision is replaced by a valid one and a missing one is inserted in such a way that the intention of the contracting parties expressed in the contract and the purpose of the contract are met as far as possible.